CS&Q SIM management

SIM management board

  • CS&Q SIM KPIs are up to date with result of the day, trend and Pareto (MDR/PRR/NQC/OTD/BOL/AC2)<br>

  • KPIs are understood by production team.<br>

  • Targets are known by the team.

  • Actions are followed and up-to date. Actions >5D are escalated in SIM5.

Operator training and polycompetency

Training management process

  • Training record available for all operators (training date and validation date).

  • Evidence that the operator understood the key tasks<br>

  • Training material is available and up to date<br>

  • Polycompetency matrix is existing and up to date.

Documentation

Workinstructions

  • Workinstructions are up to date<br>

  • Workinstructions are relevant, understood and operators follow them. They are used to train new operators.

  • Workinstructions are available and compliant with internal standard. They are signed and rev. Index is mentionned

Organization / cleanlyness

Workstation organization

  • Workstations are clean and Tidy / 5S is implemented, methodology is known by operators.

  • No personal belongings on workstations.

  • Redboxes for defects are well identified.<br>

  • Tool and equipment are placed in dedicated area following 5S standard<br>

Non conforming area management

  • The area for non conforming part for products is existing and well identified.

  • Non conformities are registered and managed with 8D approach.

Stocking: identification of pickings

  • All pickings are identified with the right reference.

  • Components are in their dedicated area. No cardbox on the floor.<br>

Measurement equipment.

Calibration of measurement equipments

  • Calibration of all measurement means and production means is up-to date.<br>

  • Gage R&R is done and capable for specific measurement equipments.

Process control effectiveness

Process control plan

  • Process control plan is up to date and revised in case of non conformity of customer issue. It adresses FMEA to issues.

  • Inspections are followed according the PCP: visual inspection / sampling / dummies. Workinstructions are aligned with PCP.

Poka-Yoke & Jidoka

  • Poka-yoke and jidokas are identified and verified on regular basis with dummies or appropriate procedure.

  • Dummies are validated and checked on regular basis.

  • The checking frequency is defined and respected.

Critical to quality / Statistical process control / Performance follow-up plan / Derogations

  • Sampling is done as per schedule / records are made on SPC tool.<br>

  • Operators understand SPC methodology: they alert in case of process drift and stop production in case of non conformity.<br>

  • Derogations are initiated and followed in dedicated list together with Schneider. No derogation > 6 monthes.

Final inspection

  • The final inspection procedure is defined and followed.

  • Record of defects is made. MDR is calculated, followed and main issues are adressed by dedicated action plan.

  • Final inspection procedure is optimized: visual controls are replaced by poka-yokes, skip lot is in place when process robustness is demostrated.

Safety and environment.

Knowledge and respect of safety and environment rules.

  • Rules clearly defined and documented in a visible way (pictos / workinstructions)

  • Rules are known by all operators.

  • The list of rescue team members is available, visible and known by all.<br>

  • Risks are known an understood<br>

  • Trash boxes are listed and identified.

Management of corrective and preventive actions.

Non conformity Notifications

  • Notification list is existing and managed in dedicated tool. Notifications are followed with 8D methodology.

  • Top issues (specially customer issues) are managed in G8D.

  • Deadlines are respected.

Maintenance.

Preventive maintenance.

  • Preventive maintenance plan is existing and executed on time.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.