Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. CS&Q Daily follow-up
SIM management board
-
Daily meeting to review Quality Key Indicators and they are up to date with result of the day, trend and Pareto (deffect rate, customer complaints, service level...)<br>(Recommended photo)
-
Key Indicators are understood by production team.<br>
-
Targets are known by the team.
2. Operator training and polycompetency
Training management process
-
Training record available for all operators (training date and validation date).
-
Evidence that the operator understood the key tasks.<br>
-
Training material is available and up to date.<br>
-
Polycompetency matrix is existing and up to date. (Recommended photo)
Documentation
Control Plans
-
Control Plans are up to date.<br>
-
Control Plans are relevant, understood and operators follow them. They are used to train new operators.
-
Control Plans are available and compliant with internal standard. They are signed and rev. Index is mentionned
-
Control plans include critical dimensions according Schneider specification.
3. Organization / cleanlyness
3.1. Workstation organization
-
Workstations are clean and Tidy / 5S is implemented, methodology is known by operators.
-
Redboxes for defects are well identified.<br>
-
Tool and equipment are placed in dedicated area following 5S standard.<br>
3.2. Non conforming area management
-
The area for non conforming part for products is existing and well identified. (Recommended photo)
-
Non conformities are registered and managed with 8D approach.
4. Measurement equipment.
4.1. Calibration of measurement equipments
-
Calibration of all measurement means and production means is up-to date.<br>
5. Process control effectiveness
5.1. Process control plan
-
There is a process FMEA to verify every step of the process flow chart.
-
Exists an action plan to reduce critical RPN.
-
There is a CQCS (Component Quality Control Specifications) provided by Schneider Electric in order to do an internal PCP.
-
Process control plan is up to date and revised in case of non conformity of customer issue. It adresses FMEA to issues.
-
Inspections are followed according the PCP: visual inspection / sampling / golden samples. Control Plans are aligned with PCP.
5.2. Suppliers of raw material and supplier tier 2
-
There is control plan and register to validate incoming inspection from raw material suppliers.
-
There is control plan and register to validate incoming inspection from supplier tier 2.
5.3. Poka-Yoke & Jidoka
-
Poka-yoke and jidokas are identified and verified on regular basis with golden samples or appropriate procedure.
-
It is defined a list of Poka-yoke and jidokas for critical parts and dimensions.
-
Golden samples are validated and checked on regular basis.
-
The checking frequency is defined and respected.
5.4. Critical to quality / Statistical process control / Performance follow-up plan / Derogations
-
Sampling is done as per schedule / records are made on SPC tool.<br>
-
Critical dimensions are registered with SPC tools.
-
There is a record of last productions and periodic analysis is done.
-
Operators understand SPC methodology: they alert in case of process drift and stop production in case of non conformity.<br>
-
Derogations are initiated and followed in dedicated list together with Schneider. No derogation > 6 monthes.
5.5. Final inspection
-
The final inspection procedure is defined and followed.
-
Record of defects is made. Defective rate is calculated, followed and main issues are addressed by dedicated action plan.
-
Final inspection procedure is optimized: visual controls are replaced by poka-yokes, skip lot is in place when process robustness is demostrated.
6. Safety and environment.
6.1. Knowledge and respect of safety and environment rules.
-
Rules clearly defined and documented in a visible way (pictos...)
-
Rules are known by all operators.
-
Trash boxes are listed and identified.
7. Management of corrective and preventive actions.
7.1. Non conformity Notifications
-
Notification list is existing and managed in dedicated tool. Notifications are followed with 8D methodology.
-
All issues are managed by G8D in I2P Schneider Electric tool.
-
Deadlines are respected: 2 days - 2 weeks - 2 months.
8. Maintenance.
8.1. Preventive maintenance.
-
Preventive maintenance plan is existing.
-
Preventive maintenance plan is executed on time.
-
There is a check list to verify areas related to critical products.