1. CS&Q Daily follow-up

SIM management board

  • Daily meeting to review Quality Key Indicators and they are up to date with result of the day, trend and Pareto (deffect rate, customer complaints, service level...)<br>(Recommended photo)

  • Key Indicators are understood by production team.<br>

  • Targets are known by the team.

2. Operator training and polycompetency

Training management process

  • Training record available for all operators (training date and validation date).

  • Evidence that the operator understood the key tasks.<br>

  • Training material is available and up to date.<br>

  • Polycompetency matrix is existing and up to date. (Recommended photo)

Documentation

Control Plans

  • Control Plans are up to date.<br>

  • Control Plans are relevant, understood and operators follow them. They are used to train new operators.

  • Control Plans are available and compliant with internal standard. They are signed and rev. Index is mentionned

  • Control plans include critical dimensions according Schneider specification.

3. Organization / cleanlyness

3.1. Workstation organization

  • Workstations are clean and Tidy / 5S is implemented, methodology is known by operators.

  • Redboxes for defects are well identified.<br>

  • Tool and equipment are placed in dedicated area following 5S standard.<br>

3.2. Non conforming area management

  • The area for non conforming part for products is existing and well identified. (Recommended photo)

  • Non conformities are registered and managed with 8D approach.

4. Measurement equipment.

4.1. Calibration of measurement equipments

  • Calibration of all measurement means and production means is up-to date.<br>

5. Process control effectiveness

5.1. Process control plan

  • There is a process FMEA to verify every step of the process flow chart.

  • Exists an action plan to reduce critical RPN.

  • There is a CQCS (Component Quality Control Specifications) provided by Schneider Electric in order to do an internal PCP.

  • Process control plan is up to date and revised in case of non conformity of customer issue. It adresses FMEA to issues.

  • Inspections are followed according the PCP: visual inspection / sampling / golden samples. Control Plans are aligned with PCP.

5.2. Suppliers of raw material and supplier tier 2

  • There is control plan and register to validate incoming inspection from raw material suppliers.

  • There is control plan and register to validate incoming inspection from supplier tier 2.

5.3. Poka-Yoke & Jidoka

  • Poka-yoke and jidokas are identified and verified on regular basis with golden samples or appropriate procedure.

  • It is defined a list of Poka-yoke and jidokas for critical parts and dimensions.

  • Golden samples are validated and checked on regular basis.

  • The checking frequency is defined and respected.

5.4. Critical to quality / Statistical process control / Performance follow-up plan / Derogations

  • Sampling is done as per schedule / records are made on SPC tool.<br>

  • Critical dimensions are registered with SPC tools.

  • There is a record of last productions and periodic analysis is done.

  • Operators understand SPC methodology: they alert in case of process drift and stop production in case of non conformity.<br>

  • Derogations are initiated and followed in dedicated list together with Schneider. No derogation > 6 monthes.

5.5. Final inspection

  • The final inspection procedure is defined and followed.

  • Record of defects is made. Defective rate is calculated, followed and main issues are addressed by dedicated action plan.

  • Final inspection procedure is optimized: visual controls are replaced by poka-yokes, skip lot is in place when process robustness is demostrated.

6. Safety and environment.

6.1. Knowledge and respect of safety and environment rules.

  • Rules clearly defined and documented in a visible way (pictos...)

  • Rules are known by all operators.

  • Trash boxes are listed and identified.

7. Management of corrective and preventive actions.

7.1. Non conformity Notifications

  • Notification list is existing and managed in dedicated tool. Notifications are followed with 8D methodology.

  • All issues are managed by G8D in I2P Schneider Electric tool.

  • Deadlines are respected: 2 days - 2 weeks - 2 months.

8. Maintenance.

8.1. Preventive maintenance.

  • Preventive maintenance plan is existing.

  • Preventive maintenance plan is executed on time.

  • There is a check list to verify areas related to critical products.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.