Information
-
Document No. *ST
-
Conducted on
-
Survey Type
- Management Survey
- Refurbishment/Demolition Survey
-
Prepared By
Site Details
-
Site Number / Name
-
Site Postcode
-
Site Photos
Building
-
Building Age
-
Building Use
Exterior Construction
Walls
-
Brick
-
Block
-
Timber Stud
-
Steel Stud
-
Fibre Cement Sheet
-
Plaster Board
-
Other
Roof
-
Timber
-
Flat
-
Felt
-
Tile
-
Concrete
-
UPVC
-
Colourbond
-
Other
Soffits/Eaves
-
Timber
-
Concrete
-
Tile
-
Lino
-
Fibre Cement Sheet
-
Other
Interior Construction
Walls
-
Brick
-
Block
-
Timber Stud
-
Steel Stud
-
Plaster Board
-
Fibre Cement Sheet
-
Other
Ceilings
-
Tiles
-
False
-
Suspended
-
Lathe & Plaster
-
Plaster Board
-
Fibre Cement Sheet
-
Other
Floors
-
Timber
-
Concrete
-
Tile
-
Lino
-
Other
-
Comments
Samples
-
Asbestos Identified
-
No ACMs identified at the time of inspection
Sample
-
Sample Number
-
Floor
- Ground
- First
- Second
- Third
- Basement
-
Location
-
Product Description
- Fibre Cement Sheet
- Tile
- Vinyl/Lino
- Gasket
- Rope
- Cement
- Pipe
- Black Electrical Backing Board
-
Quantity
-
Quantity Type
-
Extent of Damage/Condition
- Good condition: no visible damage
- Low damage: a few scratches ofr surface marks, broken edges on boards, tiles etc
- Medium damage: significant breakage of materials or several small areas where material has been damaged revealing loose asbestos fibres
- High damage or delamination of materials, sprays and thermal insulation. Visible asbestos debris
-
Sealed?
-
Photo
No Access Areas
- No Access Area
-
Description
-
Location