Title Page
-
Scissor Lift (Electric) Inspection #1
-
Jobsite:
-
Date of Inspection:
-
Make and Model: (take photo of machine)
-
Hour Meter:
-
Project Superintendent(s)
-
Operator Name:
-
Prepared By:
Items for Inspection
Daily Checklist
-
ENGINE PRE-START
-
Has the operator been instructed in the safe operation of this type of lift?
-
Ensure Annual Inspection has been completed within the last 13 months.
-
Floorboard free of debris and garbage
-
Operator’s manual complete, legible, and in storage box?
-
Tires and rims in good condition?
-
Condition of entry ladder
-
Presence of fire extinguishers
-
Is the guardrail system in good condition all around the lift?
-
Is the gate/chain functioning properly
-
Are the wires to the control box covered and secure
-
Battery Terminals
-
Battery charging cord (all 3 pins)
-
Decals
-
Pot hole guards functioning?
-
Controls are clearly marked?
-
Control levers, switches, Gauges and instruments operate properly, including options (horns, lights, etc.).
-
Arm safety props operational
-
Drive Motors
-
Emergency stop switches at the ground & platform control stations operate properly, (Shuts off controls & engine)
-
Platform goes Up & Down
-
Manual descent/auxiliary power system operates properly.
-
Arm pins, wear pads & attaching hardware secure & undamaged.
-
Wheel turns smoothly?
-
Extension platform slide is clean and locks in place?
-
GFI outlet inside platform working? Cover in place?