Information
-
SD37 - 4-Stage Clearance Site Audit Sheet - Issue 3 - April 2013
-
Document No:
-
Site:
-
Date:
-
Prepared by:
Job Details
-
Job Number:
-
Client:
-
Date:
-
Site Address:
-
Purpose of Audit:
- Initial Audit
- On-going Competence
- Result of a Failure in Procedures
- Re-Authorisation
- Other
-
Auditee's Name & Signature:
-
Auditor's Name & Signature:
Audit Summary:
-
Equipment:
-
Procedures:
-
Documentation:
-
Paperwork:
-
Comments:
Health & Safety:
-
Is the analyst clean shaven?
-
Is a shave kit available on site?
-
Is RPE available?
-
Is RPE clean and labelled?
-
Does the analyst have tyveks available?
-
Does the analyst have cover shoes available?
-
Does the analyst have safety boots available?
-
Does the analyst have a hi-viz jacket/vest available?
-
Does the analyst have a hard hat and/or bump cap available?
-
Does the analyst have gloves available?
-
Does the analyst have ear defenders available?
-
Does the analyst have safety glasses/goggles available?
-
Does the analyst have knee pads available?
-
Does the analyst have a first aid kit available?
Equipment:
-
Flowmeter numbers (long and short tubes):
-
Are the flowmeters within calibration date and correctly labelled?
-
Stage micrometer number:
-
Is the stage micrometer within calibration date and correctly labelled?
-
NPL test slide number:
-
Is the NPL within calibration date and correctly labelled?
-
Timer number:
-
Is the timer within calibration date and correctly labelled?
-
Air sampler numbers (including personal pump):
-
Do all air samplers have current service records and are they correctly labelled?
-
Microscope number:
-
Does the microscope have a current service record and is it correctly labelled?
-
Detail the cosmetic condition of the equipment and whether it is functioning correctly - identify any potential faults or actions required if the equipment is not labelled or calibrated:
-
Take the microscope out of phase and ask the analyst to set it up. Describe performance and detail any guidance required:
Documentation:
-
Does the analyst have a copy of HSG248 available?
-
Does the analyst have a copy of TP03 available?
-
Comments/Action Required?
Certificate of Reoccupation Procedures:
-
Job details:
Stage 1:
-
Has the analyst verified the generic risk assessments?
-
Has the analyst completed the document verification process satisfactorily?
-
Has the analyst conducted a satisfactory initial inspection of the exterior of the enclosure and adjacent areas?
-
Has the analyst conducted a satisfactory initial inspection of the hygiene facility and transit route?
-
Has the analyst conducted a satisfactory initial inspection of the waste route and waste storage area?
-
Further Comments and observations:
Stage 2:
-
Is the analyst's entry/exit procedure to/from the enclosure satisfactory?
-
Is the standard of the visual inspection satisfactory?
-
Has the analyst had to use any ladders/scaffold towers within the area? If so was this done correctly?
-
Further comments and observations:
Stage 3:
-
Has the analyst used an appropriate sampling strategy?
-
Did the analyst carry out the dust disturbance procedure correctly?
-
Further comments and observations:
Stage 4:
-
Has the analyst carried out a satisfactory inspection of the former enclosure area?
-
Has the analyst carried out a satisfactory inspection of the former work areas and the transit/waste route?
-
Further comments and observations:
Site Documentation:
-
Have the contractor signatures been collected as required?
-
Has the summary of works been completed adequately?
-
Further comments and observations:
Audit Summary:
-
Audit outcome:
Staff Feedback:
-
Is there anything that could make the analyst's job easier? (Please get the analyst to fill in Staff Feedback Form SD59 to be filed with Action Form SD06)
Required Actions:
-
Is any action required? Please note the action numbers (DD/MM/YYYY/01 etc - Please also fill in separate action forms SD06 for each action and complete the Action Log SD99)
-
Comments: