Bathroom Inspection check list Hurlingham Walk

Activity: 1st fix-timber framing in the bathrooms

  • Check type of bathroom/ensuite.

  • Check the area is clear of materials and debris.

  • Check ceilings completed in the bathroom including bulk head

  • Check type of bathroom/ensuite.

  • Check WC framing ( Installed by plumbing sub-contractor ) to centre line & check levels.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: Low level vanity boxing and bath framework support .

  • Check that bath support frame is installed according to the drawing

  • Check low level framing been installed according to the drawing setting out ,plumb and level<br>

  • Check framework been cladded in plywood and all necessary access panels been installed according to the drawing and on keku clips

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: Bath framework

  • Check that bath installed by M&E Contractor

  • Check that Bath panel framework been completed and cladded in plywood including access panel

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: Survey and installation of glass panel surround and associated trims

  • Check that glass trims been installed according to the drawings and the glass been surveyed .

  • Check that glass been installed

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: Installation of Mirrored Vanity Unit

  • Check that Mirrored Vanity Unit been installed according to the drawing .<br>

This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.