Information
-
Document No.
-
Audit Title
-
St James / Hurlingham Walk
-
Conducted on
-
Prepared by
-
Hurlingham walk London
-
All site Team
Inspection check list
Activity: Door set installation.
-
Check that the structural openings are correct.
-
Check the area is clear of materials and debris and the flooring is protected 50mm short of the walls to allow installation of skirting .
-
Install doors and linings in accordance to the door manufactures installation instructions.
-
Internal flat doors single. No of Doors:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Internal flat doors double. No of Doors:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
Activity: Install architraves.
-
Check the required lengths.
-
Cut the mitres for the heads and legs of the architraves in accordance with SEC RAMs & HS polices.
-
Check the fixings are adequate and mitres are flush fitting and are not stepped.
-
Check fixings are below surface.
-
Check free from damage, burrs and abrasions.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
Activity: install skirting.
-
Check skirting is fixed to line and level.
-
Check internal scribes and external mitre 90 degree<br>
-
Check fixings are below surface.
-
Check free from damage, burrs and abrasions.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor