Information
-
Document No.
-
Client / Site
-
Prepared by
-
Conducted on
-
Name & Location of site visit
-
Persons Interviewed
PROJECT TIMELINE
-
Beginning Date of On-site Construction
-
Projected Completion Date
CCTV DEPLOYMENT
-
When was the kickoff meeting with Cisco held?
-
Have all of the servers been installed?
-
Verify with a picture of racks.
-
Has security and IT&S provided Cisco with PDF maps of entire facility?
-
Where did they locate them?
-
Are the cameras in the correct location per the drawing
-
Verify a copy of the Cisco packing slips from CDW is available
-
Has a copy of the signed off packing list been sent back to Bill Hapner of Kelly Frye?
-
Is all of the Cisco equipment onsite?
-
Does the facility plan on expanding the CCTV system in the next 12 months?
CCTV PROGRAMMING
-
Has the DHCP server been set up?
-
Has security and IT&S named all of the cameras?
-
Has security and IT&S created viewing groups?
CCTV TRAINING
-
Has Cisco supplied the site with the kickoff materials that need to be filled out?
-
Has any training on the software been done?
-
The training will be completed by:
ACCESS CONTROL
-
Were there any changes recommended following the gap analysis?
-
Are they in the correct locations per the drawings?
-
Does the hospital have badges for all employees?
-
Are the cards programmed and ready for use by every staff member?
-
Are badges "first name only" on badge?
-
Are badges printed on both sides?
-
Has any training for on the software been done?
-
When is the training scheduled to be done?
DURESS ALARMS
-
Are the correct number of units installed per the drawing?
-
Are the units at the correct locations per the drawing?
-
Were any PC duress alarms installed?
-
Does the hospital plan to expand the duress system?
DURESS ALARM TRAINING
-
Has the staff been trained on the use and the location of the duress button?
-
Has the staff been trained on the use of the PC duress alarm?
EMERGENCY CALL BOXES
-
Are the unts in the correct locations per the drawing?
-
Have the units been programed with the correct dial in number?
EMERGENCY CALL BOX TRAINING
-
Has any training on the units been done?
-
When is the training scheduled to be done?
CABLING
-
Has all of the cabling been done?
-
Is the cabling off the ceiling grid?
-
Is the cable in J-hooks/D-Ring/cable tray?
-
Has the hospital signed off on the cabling installation and penetration caulking?
OVERALL ASSESSMENT
-
What problems are the hospital having with the installation?
-
Has the contractor given their completion timeline?
-
What is the completion date given
-
Is there anything holding up the installation from HCA's side?
-
List the issues that HCA is responsible for:
FACILITY MANAGEMENT
-
Is the project sign-in log being filled out every day?
-
Are all needed permits in the project book?
-
Did all of the vendors go through orientation?
-
Have facility provide a copy of the list of personnel that are training on each system
-
What areas could each contractor have done better in?
COO INFORMATION
-
Is the COO aware of the status of the current project?
-
How could this project have gone better?