Information

  • Document No.

  • Conducted on

  • Job Name

  • Job Number

  • Prepared by

  • Location

Sitework

  • Will you be working on concrete in the next 30 days? If yes please click the Add Materials Button.

  • Core Inputs
  • Will you be working on formwork? If yes please click the Add Formwork Button.

  • Quality Checks

Materials, Tools and Consumables

  • Did materials, tools and consumables arrive on time ?

  • Have you checked the that materials, tools and consumables meet requirements?

  • Have you verified that tools have been calibrated?

  • Have you verified that tools have no defects?

  • Are materials and other consumables free from defects?

  • Have you verified that tools and equipment have certificates of inspection

  • Have you verified that materials have a certificate of conformamnce?

  • Are you using Contractors? If so click the Add Contractors.

  • Contractors

Competency

  • Are RAMS available for review?

  • Has a Point of Work Risk Assessment been completed?

  • Do you contractors possess safety competency qualifications CSCS, CPCS etc.?

  • Is there evidence of Safety Toolbox talks?

Masonry

    Masonry
  • Are you installing Brick or Block. If yes click on the Add Brick/Block Button.

  • Brick/Block

Brick, Stone, Masonry or Block

  • Is weather protection needed?

  • Have you verified all openings(windows, doors, elevator shafts)?

  • Have you verified elevation of embeds(elevator inserts, bearing plates, are fit for purpose etc.)?

  • Is flashing still intact?

  • Are brick ties or horizontal reinforcing secured?

  • Is further shoring required?

  • Guttering

Precast or plastic guttering

  • Have you verified that guttering and drainage is secure?

  • Have you verified the connection details?

  • Metals Structural Steel

Quality Checks

  • Did you verify anchor bolt spacing?

  • Who is responsible for ensuring that structural integrity? Has this been done?

  • Is a 3rd party testing agency required to inspect steel? Have you complied with all inspections required?

  • Carpentry
  • Are you doing carpentry? If so click the Add Carpentry Button.

  • Carpentry

Carpentry

  • Have you verified openings for windows and doors required to be secured?

  • Have you verified the condition of truss spacing at floor and roof trusses?

  • Have you coordinated blocking requirements?(toilet accessories, grab bars, cabinets, shelving, etc.)

  • Are all windows at the same elevation?

  • Have you verified truss orientation?

Division #8 - Doors & Windows

  • Are you working with Door Installation? If so click the Add Doors Button.

  • Doors

Doors

  • Have you verified that the Hollow Metal frames are securely anchored ?

  • Have you verified if the door frames required to be secured?

  • Have you verified rated doors and frames are labeled and installed where shown?

  • Have you verified correct materials are used for secure door?

  • Have you verified that is in fire exits are free from obstruction?

  • Have you verified that the wood doors shimmed and fastened properly?

  • Are you working with Windows? If so click the Add Windows Button.

  • Windows

Windows

  • Ensure that broken window glass or debris is cleared from work areas?

  • Have you verified the windows that require shoring?

  • Are windows security installed and sealed properly?

  • Welfare
  • Are welfare facilities available on site? If so click on the Add Welfare Button

  • Amenities

Access to drinkable water and toilet facilities

  • Do operators have access to clean water and sanitisation facilities?

  • Do operators have access to toilet facilities?

  • Conveying System

Elevator or escalator

  • Have you identified pit opening, shafts and machine room ?

  • Are pit openings, shafts and machine rooms secured?

  • Have signage been installed in the proper location?

Division #15 - Plumbing, Mechanical & Sprinkler Systems

  • Are you currently working on derelict Plumbing and or HVAC? If so click on the Add Plumbing & HVAC Button.

  • Plumbing & HVAC

Quality Checks

  • Have you verified if ducts and plumbing require shoring?

  • Have you verified that all ducts are secured properly?

  • Have you coordinated water supply, electrical starters, transformers, controllers are disconnected?

Electrical

  • Are you currently working on Electrical or near Electrical wiring? If so click the Add Electrical Button.

  • Electrical

Electrical Quality Checks

  • If you have electrical panels, has this been isolated?

  • Have you verified the electrical subcontract to ensure that all electrical safety signage has been installed?

  • Have you verified certificates of electrical isolation and decommissioning?

  • Have you verified the location and size of equipment pads?

Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • Quality Inspector's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.