Title Page

  • Client Name

  • Site Address

  • Date

  • Inspected by

  • Description of work

  • Contractor

  • Are SEE Services Ltd the Principle Contractor

  • Is the CPP in place and suitable

  • Does the CPP cover all Subcontractors and tertiary Contractors

1of17 ON-SITE Procedures

1. On-Site Procedures

  • 1.1 Are RA & MS with the work team?

  • 1.2 Have RAMS been briefed to the work team?

  • 1.3 Are works in accordance with RAMS?

  • 1.4 Do working methods keep risks to a minimum?

  • 1.5 Have site induction been given by site Premises Controller/Main Contractor?

  • 1.6 Has toolbox talks been given to the work team by the SPiC /Supervisor?

  • 1.7 Have workforce signed in on site before starting work?

  • 1.8 Are Accident reporting & recording arrangements adequate?

  • 1.9 Have there been any accidents?

  • 1.10 Are emergency procedures adequate for all likely scenarios?

  • 1.11 All operatives have CSCS /ECS Cards

2. Access & Egress

  • 2.1 Is access/egress from site & workplace safe & clear of obstructions?

  • 2.2 Are work areas free from slipping and tripping hazards?

  • 2.3 Is lighting provided adequate for poor light conditions?

  • 2.4 ladders, Inspected/non-conductive/ appropriately used?

3. First Aid

  • 3.1 Is there a company first aider on site?

  • 3.2 Do Engineers know how to summon help

  • 3.3 Do Engineers have access to a first aid kit?

4. PPE

  • 4.1 Is PPE appropriate, undamaged, suitable for the task & being worn?

5. Materials & Hazardous Substances

  • 5.1 Are materials/ hazardous substances stored in a safe & secure manner?

  • 5.2 Are COSHH assessments available for all Hazardous substances?

6. Waste

  • 6.1 Is the subcontractor registered for producing hazardous waste

  • 6.2 Is waste being disposed of correctly?

7. Noise

  • 7.1 Have noise risk assessments been carried out if appropriate?

  • 7.2 Are the noise control measures used as required?

8. Fire Precautions

  • 8.1 Has appropriate fire safety training been carried out?

  • 8.2 Are work areas kept clear of combustible materials & cleared at the end of the shift

  • 8.3 Do the operatives know where the nearest fire point is situated

  • 8.4 Are operatives aware of the nearest escape route

  • 8.5 Do engineers know how to raise the alarm in case of fire

  • 8.6 Do Engineers know where the Assembly point is

9. Hot Work

  • 9.1 Are Hot Work Permits in use?

  • 9.2 Does the Engineer have a permit present?

  • 9.3 Does the Engineer have a written hot works RAMS?

  • 9.4 Do Engineers have a signed copy of the RAMS with them?

  • 9.5 Combustibles removed /protected prior to hot working?

  • 9.6 Are hot tools & equipment sited on non- combustible surfaces?

  • 9.7 Are suitable class fire extinguishers on hand during hot works?

  • 9.8 Do the available extinguishers belong to the contractor

  • 9.9.0 Number of serviceable extinguishers on hand - WATER

  • 9.9.1 Number of serviceable extinguishers on hand - FOAM

  • 9.9.2 Number of serviceable extinguishers on hand - POWDER

  • 9.9.3 Number of serviceable extinguishers on hand - CO2

  • 9.10 Has a fire risk assessment been carried out & available?

  • 9.11 Welding: Are screens on site?

  • 9.12 Are hot work areas inspected before permits are cancelled (fire watch)?

10. Working at Hight (Not Scaffolds)

  • 10.1 Edge protection adequate : prevent person/materials falling?

  • 10.2 Are suitable precautions taken to protect persons & objects below?

  • 10.3 Are ladders inspected & used correctly

11. Electricity

  • 11.1 Is LOCKOUT-TAGOUT being used?

  • 11.2 Is a single key safety padlock being used for lockout?

  • 11.3 Is portable electrical equipment operated at low voltage (110v or less)?

  • 11.4 Is “NO LIVE WORKING” being observed?

  • 11.5 Are electrical tools and equipment PATested by a competent person?

  • 11.6 Are all Operatives working in low voltage equipment rooms suitable Competent? :

  • 11.7 Are test equipment to GS38 and a voltage indicator available

12. Plant, Tools and Equipment

  • 12.1 Is all plant operated by trained persons.?

  • 12.2 Are maintenance arrangements for plant & equipment (inc. hired) satisfactory?

  • 12.3 Is plant and equipment in good repair & used correctly

  • 12.4 Are machinery guards secure and in good condition

13. Hoists & Lifting Tackle

  • 13.1 Are hoists & lifting tackle being used correctly & to the lifting plan?

  • 13.2 Lifting equipment marked & certified SWL?

14. Scaffolding - provided for our use by others

  • 14.1 Is it suitable for the task being carried out & inspected at the statutory times?

15. Mobile Scaffold towers

  • 15.1 Do operatives have valid PASMA certificate for erecting the equipment

  • 15.2 Is the tower erected in accordance with the manufacturer’s instructions

  • 15.3 Are wheels locked when the mobile tower is in position?

  • 15.4 Is the tower being used correctly & not overloaded?

16. Mobile elevated work platforms (MEWPS)

  • 16.1 Do operators have a valid IPAF license?

  • 16.2 Are the correct harness & restraint lanyards available & used?

  • 16.3 Are MEWPS left secure/isolated when unattended or at night?

  • 16.4 Is there a valid test cert. for the MEWP

17. Safe Gas approved

  • 17.1 Are Gas operatives Safe Gas approved and carrying appropriate certification?

Comments

  • Any other comments

Safety Corrective Actions Report Issued

  • undefined

undefined

  • Inspectors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.