Title Page
-
Client Name
-
Site Address
-
Date
-
Inspected by
-
Description of work
-
Contractor
-
Are SEE Services Ltd the Principle Contractor
-
Is the CPP in place and suitable
-
Does the CPP cover all Subcontractors and tertiary Contractors
1of17 ON-SITE Procedures
1. On-Site Procedures
-
1.1 Are RA & MS with the work team?
-
1.2 Have RAMS been briefed to the work team?
-
1.3 Are works in accordance with RAMS?
-
1.4 Do working methods keep risks to a minimum?
-
1.5 Have site induction been given by site Premises Controller/Main Contractor?
-
1.6 Has toolbox talks been given to the work team by the SPiC /Supervisor?
-
1.7 Have workforce signed in on site before starting work?
-
1.8 Are Accident reporting & recording arrangements adequate?
-
1.9 Have there been any accidents?
-
1.10 Are emergency procedures adequate for all likely scenarios?
-
1.11 All operatives have CSCS /ECS Cards
2. Access & Egress
-
2.1 Is access/egress from site & workplace safe & clear of obstructions?
-
2.2 Are work areas free from slipping and tripping hazards?
-
2.3 Is lighting provided adequate for poor light conditions?
-
2.4 ladders, Inspected/non-conductive/ appropriately used?
3. First Aid
-
3.1 Is there a company first aider on site?
-
3.2 Do Engineers know how to summon help
-
3.3 Do Engineers have access to a first aid kit?
4. PPE
-
4.1 Is PPE appropriate, undamaged, suitable for the task & being worn?
5. Materials & Hazardous Substances
-
5.1 Are materials/ hazardous substances stored in a safe & secure manner?
-
5.2 Are COSHH assessments available for all Hazardous substances?
6. Waste
-
6.1 Is the subcontractor registered for producing hazardous waste
-
6.2 Is waste being disposed of correctly?
7. Noise
-
7.1 Have noise risk assessments been carried out if appropriate?
-
7.2 Are the noise control measures used as required?
8. Fire Precautions
-
8.1 Has appropriate fire safety training been carried out?
-
8.2 Are work areas kept clear of combustible materials & cleared at the end of the shift
-
8.3 Do the operatives know where the nearest fire point is situated
-
8.4 Are operatives aware of the nearest escape route
-
8.5 Do engineers know how to raise the alarm in case of fire
-
8.6 Do Engineers know where the Assembly point is
9. Hot Work
-
9.1 Are Hot Work Permits in use?
-
9.2 Does the Engineer have a permit present?
-
9.3 Does the Engineer have a written hot works RAMS?
-
9.4 Do Engineers have a signed copy of the RAMS with them?
-
9.5 Combustibles removed /protected prior to hot working?
-
9.6 Are hot tools & equipment sited on non- combustible surfaces?
-
9.7 Are suitable class fire extinguishers on hand during hot works?
-
9.8 Do the available extinguishers belong to the contractor
-
9.9.0 Number of serviceable extinguishers on hand - WATER
-
9.9.1 Number of serviceable extinguishers on hand - FOAM
-
9.9.2 Number of serviceable extinguishers on hand - POWDER
-
9.9.3 Number of serviceable extinguishers on hand - CO2
-
9.10 Has a fire risk assessment been carried out & available?
-
9.11 Welding: Are screens on site?
-
9.12 Are hot work areas inspected before permits are cancelled (fire watch)?
10. Working at Hight (Not Scaffolds)
-
10.1 Edge protection adequate : prevent person/materials falling?
-
10.2 Are suitable precautions taken to protect persons & objects below?
-
10.3 Are ladders inspected & used correctly
11. Electricity
-
11.1 Is LOCKOUT-TAGOUT being used?
-
11.2 Is a single key safety padlock being used for lockout?
-
11.3 Is portable electrical equipment operated at low voltage (110v or less)?
-
11.4 Is “NO LIVE WORKING” being observed?
-
11.5 Are electrical tools and equipment PATested by a competent person?
-
11.6 Are all Operatives working in low voltage equipment rooms suitable Competent? :
-
11.7 Are test equipment to GS38 and a voltage indicator available
12. Plant, Tools and Equipment
-
12.1 Is all plant operated by trained persons.?
-
12.2 Are maintenance arrangements for plant & equipment (inc. hired) satisfactory?
-
12.3 Is plant and equipment in good repair & used correctly
-
12.4 Are machinery guards secure and in good condition
13. Hoists & Lifting Tackle
-
13.1 Are hoists & lifting tackle being used correctly & to the lifting plan?
-
13.2 Lifting equipment marked & certified SWL?
14. Scaffolding - provided for our use by others
-
14.1 Is it suitable for the task being carried out & inspected at the statutory times?
15. Mobile Scaffold towers
-
15.1 Do operatives have valid PASMA certificate for erecting the equipment
-
15.2 Is the tower erected in accordance with the manufacturer’s instructions
-
15.3 Are wheels locked when the mobile tower is in position?
-
15.4 Is the tower being used correctly & not overloaded?
16. Mobile elevated work platforms (MEWPS)
-
16.1 Do operators have a valid IPAF license?
-
16.2 Are the correct harness & restraint lanyards available & used?
-
16.3 Are MEWPS left secure/isolated when unattended or at night?
-
16.4 Is there a valid test cert. for the MEWP
17. Safe Gas approved
-
17.1 Are Gas operatives Safe Gas approved and carrying appropriate certification?
Comments
-
Any other comments
Safety Corrective Actions Report Issued
-
undefined
undefined
-
Inspectors Signature