Information

  • Audit Title

  • Document No.

  • Conducted on

  • Location
  • CoA SWQ Permit: 2013653514

    State of Colorado CDPS Permit; COR03K310

  • Total Project Area: 7.71 acres

    Total Project Area to be disturbed: 7.20 acres

  • Name and Title of Inspector(s)

  • Weather at time of inspection

  • Type of Inspection

  • Precipitation Start Date

  • Precipitation Stop Date

  • Type of Runoff

  • Amount of Precipitation

  • Current Site Activities

  • Is the Inspector a "qualified person" in accordance with 3.1.2?

  • Have all site activities begin with proper installation of sediment and perimeter controls?

  • Area with missing control

  • Sediment Control
  • Picture of missing control

  • Description of operation and maintenance needed

  • Are all stockpiles properly protected relevant to their location?

  • Stockpile location

  • Stockpile
  • Picture of stockpile

  • Description of location and maintenance needed

  • Do all perimeter controls have less than one-half sediment accumulation of the above ground height?

  • Areas where sediment accumulation is occurring

  • Sediment Accumulation
  • Picture of sediment accumulation

  • Description of location and maintenance needed

  • Is sediment track-out on streets, paved areas, and sidewalks minimized?

  • Areas where tracking is occurring

  • Tracking
  • Picture of tracking

  • Description of location and maintenance needed

  • Is all construction traffic access limited to designated VTCs and pedestrian access points?

  • Areas where non-designated access is occurring

  • Non-Designated Access
  • Picture of non-designated access

  • Description of location and maintenance needed

  • Is fugitive dust being minimized?

  • Fugitive Dust Location

  • Fugitive Dust
  • Picture of fugitive dust

  • Description of location and maintenance needed

  • Are discharge points and receiving waters free of any sediment deposits or pollutants?

  • Discharge location

  • Sediment/Pollutant
  • Picture of sediment deposit

  • Description of location and maintenance needed

  • Is there any discharging groundwater or accumulated stormwater that is removed from excavations, trenches, foundations, vaults, or other similar points?

  • Is the dewatering in compliance with the discharge requirements?

  • Dewatering Location

  • Dewatering
  • Picture of dewatering

  • Description of location and maintenance needed

  • Have soil stabilization measures been initiated if earth -disturbing activities have permanently or temporarily ceased (14 days)?

  • soil stabilization area

  • soil stabilization
  • Picture of area needing stabilization

  • Description of location and maintenance needed

  • Are any of the following being generated on site: concrete wash water, wastewater pain cleanout, oils, fuels, soaps, solvents, detergents, or other toxic substances prohibited by City of Aurora Stormwater Rules and Regulations Manual?

  • Are materials being properly maintained?

  • unmaintained toxic substance

  • toxic substance
  • picture of regulated substance

  • description of location and maintenance needed

  • Are equipment or vehicles being fueled and/or maintained on site?

  • Are effective means of eliminating the discharges of spilled or leaked chemicals being utilized? i.e. drip pans, spill supplies

  • Preventative measures in equipment areas

  • Equipment Maintenance
  • picture of maintenance or fueling operation

  • description of location and maintenance needed

  • Are vehicle equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious materials?

  • Spill/Leak in Equipment Area

  • Spill/Leak
  • picture of spill/leak

  • description of location and maintenance needed

  • Is trash/litter being collected and placed in covered dumpsters?

  • Areas with trash/litter

  • trash/litter
  • picture of trash/litter

  • Description of location and maintenance needed

  • Are washout facilities (e.g. paint, stucco, concrete) available and maintained?

  • Washout Facility

  • Washout
  • picture of unmaintained wash out

  • Description of location and maintenance needed

  • Is the project site and adjacent property free of visible erosion?

  • Area of visible erosion

  • erosion
  • picture of erosion

  • Description of location and maintenance needed

  • Are all BMPs and containers in proper working order to prevent spills, leaks, or other accumulations of pollutants?

  • Area of insufficient BMP/containment

  • containment
  • picture of BMP/containment

  • Description of location and maintenance needed

  • Are all other conditions on site in compliance with the permit?

  • Other item to be addressed
  • Picture of area of concern

  • Description of item to be addressed and location

  • Have you inspected ALL areas that have been cleared, graded, or excavated and that have not yet completed stabilization?

  • Have you inspected ALL Stormwater controls including pollution prevention measures?

  • Have you inspected ALL material, waste, borrow or equipment storage and maintenance areas?

  • Have you inspected ALL areas where Stormwater flows within the site?

  • Have you inspected ALL points of discharge?

  • Have you inspected ALL locations where stabilization measures have been implemented?

  • If you declared a portion of the site unsafe to inspect, have you described the reasoning?

H-1: Inlet south of Harvard curve, in parking lot

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

H-2: Inlet on south side Harvard curve, on old Harvard

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

H-3: inlet on north side of Harvard curve, on Harvard near Holiday Inn Express

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

H-4: At grade Inlet at north end of site just east of Iliff off ramp

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

C-1: culvert at north end of segment I on the SE corner of I225 off ramp and Iliff

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

VTC-H1: access on Harvard in front of Post Office

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

VTC-H2: access on Harvard next to Fairfield Inn

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

O-1 outfall on Toll Gate Creek, under 17th Place bridge

  • Add media

  • Current condition?

  • Observations

  • Actions taken, Date, Initials

  • "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance withe a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.