Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

  • Add location

POWER

  • Turn on Master power-switches located in the control room.

  • Turn on amp power from Green Room <br>

  • Turn on power in Hall 2 <br>

Gathering Information

  • Collect Technical Ryder from tech room<br>

  • Stage Team Meeting - Assign Tasks

SET UP / PACK IN

  • Complete the technical Ryder

  • Line Check

  • All Audio Components Line Checked <br>

  • All Stage Components Line Checked <br>

  • Ready for sound tech to test

Visual Link Test

  • Projectors in both auditoriums on <br>

  • Switcher on FOH.

  • Song show plus and notices working (audio for notices)

  • Scriptures and songs loaded

  • Visual feeds into crèche and allocated halls working

  • Ready for service

Lighting

  • Lighting board on

  • Blackout off

  • Flood lights working

  • Spotlights working

  • LEDs working

  • Ready for service

Audio

  • Sound desk on

  • Audio feeds into crèche and allocated halls are working

  • Mics working

  • Instruments feeds working

  • Ready to sound check

Set up debrief

  • Problems faced

  • Solutions

Ready for service

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.