Title Page
-
Depot Name
-
Location/site
-
Depot Work Stream
- Mains Renewal
- Offsite developer
- R&M
- DS
- Strategic
- Above Ground
- Engineering
- Storage
-
Conducted on
-
Carried out by / role
-
Principal owner
-
Used by
- Murphys
- Clancy
- Enisca Browne
- Stonburys
- DDS
- SEW
- J Brownes
- Other
-
Site manager
-
description of activity on site - detailed
-
Equipment / plant on site
-
Weather conditions
Depot Information Pack
-
Site Manual on site: SEW Environmental Information for Depots, Site ECOR, Drainage Plans (showing location of manholes, grids, and any areas where water collects); Tree Protection Plan (showing location of trees on site with OS grid reference and indication of RPA;, Site Layout Plan ( showing location of spill kits, storage of hazardous waste or materials and indicative locations for waste, materials and plant storage)
-
Issue date? Review date?
-
What is missing and why?
-
Contractor Facilities Environmental Management Plan on site - visible / easily accessible
-
-
Issue date? Review date?
-
Contractor or client environmental induction undertaken/recorded.
-
-
Environmental verbal reporting chain on site – visible / easily accessible by responsible person.
-
-
Appropriate discharge Consents / notifications / permits in place – visible / easily accessible by responsible person.
-
Issue date? Review date? Details about documents?
-
-
Spillage / Emergency Procedure documents
-
-
Issue date? Review date?
-
Pollution Emergency Response Plan & Training Records
-
Issue date? Where is it kept?
-
-
Waste & Discharge Regulations Documents
-
Issue date? Review date? Which documents are present?
-
-
Inspections / Reporting procedures
-
What were the documents and what is their issue & review date?
-
-
Waste Carriers License
-
Issue date? Review date? Is anything missing?
-
-
Site Tenancy Agreement
-
Where is the copy stored? Who has it? Date of issue?
-
Why no?
Housekeeping and Storage
-
Site housekeeping in order (i.e. no litter, site secure, welfare units in good order, etc.).
-
-
Vehicles restricted to agreed areas only (parking and movement).
-
-
Storage of materials, equipment, spoil etc. in agreed areas only and correct methods used (i.e. on pallets, pipe ends covered).
-
-
Provide examples
-
Chemicals / Fuels / oils all stored appropriately?
-
-
Provide examples
Ecology
-
Are the appropriate ecological mitigation in place as detailed in Environmental Appendix (i.e. ramps in excavations, spoil covered appropriately)?
-
-
Are the appropriate Licences / Assents/ MS held on site – visible / easily accessible by responsible person?
-
-
Vegetation clearance undertaken authorised?
-
-
Reinstatement planned / undertaken as detailed in the Environmental Appendix.
-
Arboriculture
-
Are the works being undertaken in accordance with NJUG: Vol.4 2007 (e.g. hand digging where necessary, RPA maintained)?
-
-
Have works adjacent to or on sensitive trees been completed as per Env App (e.g. excavation adjacent to TPOs supervised).
-
-
Avoided damage to any tree roots >25mm by works.
-
Archaeology and Heritage
-
Is there any archaeological mitigation, including supervision if required in place as detailed in Environmental Appendix.
- Yes
- No
- N/A
-
Water Environment
-
Appropriate mitigation measures in place as detailed in the SEW Environmental Information for Depots(i.e. silt control measures in place for works close to watercourses / drains)?
-
-
Which measures are in place?
-
Appropriate Flood Risk Activity – Environmental Permit / Exemption or Ordinary Watercourse Consent held on site – visible / easily accessible by responsible person?
-
-
Is the watercourse free from any signs of pollution in watercourse, if applicable.
-
-
What signs of pollution are visible?
-
Appropriate discharge control methods in place (e.g. dewatering of excavations, from pipeline testing etc.) – visible / easily accessible by responsible person.
-
-
Spill kits available on site and fully stocked?
-
-
Are bunds / drip trays under static plant and if necessary plant left immobile for prolonged periods?
-
-
Refuelling procedures satisfactory (i.e. bunding / drip trays used).
-
-
Any Visible oil/ diesel on ground?
Noise and air pollution control
-
Emissions and noise from vehicles, generators, pumps etc. minimalised using best practice (i.e. engines turned off if not in use, silencers installed, noise abatement fencing in place etc.)
-
-
Dust controlled using appropriate methods
-
-
Why?
-
What methods are in use?
-
Working to agreed hours
-
Waste Management and records
-
Waste transfer notes available on site.
-
-
Paper copies? Electronic copies?
-
Evidence of compliance with regulatory frameworks (NWFD Exemption, RPS211, Asbestos Regs etc)
-
Issue Date? Review Date?
-
What is missing?
-
Quantities / types of waste recorded.
-
-
Waste types segregated and clearly identified (i.e. bins / skips provided & labelled including recycling facilities).
-
-
Please explain why non compliant:
-
Explain further:
Other
-
Other observations on site:
Photos
-
Add media