Title Page
-
Scheme Name
-
Location/Site
-
Site Conducted
- Mains Renewal
- Offsite Developer
- R&M
- DS
- Strategic
- Above Ground
- Minor Works
- Other
-
Conducted on
-
Carried out by
-
Contractor
- Murphy's
- Clancy
- Enisca Browne
- Stonburys
- DDS
- SEW
- J Brownes
- Other
-
Sub Contractor
-
Brief description of works / Activity on site
-
Any obersavtions or non-compliances from previous site visits? If yes please not them below.
Environmental Documents
-
Copy of Environmental documents held on site and in date – visible / easily accessible by responsible person
-
Contractor or client Toolbox Talk / environmental induction undertaken/recorded.
-
Environmental verbal reporting chain on site – visible / easily accessible by responsible person.
Housekeeping and Storage
-
Site housekeeping in order (i.e. no litter, site secure, welfare units in good order, etc.).
-
Vehicles restricted to agreed areas only (parking and movement).
-
Storage of materials, equipment, spoil etc. in agreed areas only and correct methods used (i.e. on pallets, pipe ends covered).
-
Chemicals / Fuels / oils all stored appropriately?
Ecology
-
Are the appropriate ecological mitigation in place as detailed in Environmental Appendix (i.e. ramps in excavations, spoil covered appropriately)?
-
Are the appropriate Licences / Assents/ MS held on site – visible / easily accessible by responsible person?
-
Vegetation clearance undertaken authorised?
-
Reinstatement planned / undertaken as detailed in the Environmental Appendix.
Arboriculture
-
Are the works being undertaken in accordance with NJUG: Vol.4 2007 (e.g. hand digging where necessary, RPA maintained)?
-
Have works adjacent to or on sensitive trees been completed as per Env App (e.g. excavation adjacent to TPOs supervised).
-
Avoided damage to any tree roots >25mm by works.
Water Environment
-
Appropriate mitigation measures in place as detailed in the Environmental Appendix (i.e. silt control measures in place for works close to watercourses / drains)?
-
Appropriate Flood Risk Activity – Environmental Permit / Exemption or Ordinary Watercourse Consent held on site – visible / easily accessible by responsible person?
-
Is the watercourse free from any signs of pollution in watercourse, if applicable.
-
Appropriate discharge Consents / notifications / permits and control methods in place (e.g. dewatering of excavations, from pipeline testing etc.) – visible / easily accessible by responsible person.
-
Spill kits available on site and fully stocked?
-
Are bunds / drip trays under static plant and if necessary plant left immobile for prolonged period.
-
Refuelling procedures satisfactory (i.e. bunding / drip trays used). Any visible oil/diesel on ground.
Archaeology and Heritage
-
Is there any archaeological mitigation, including supervision if required in place as detailed in Environmental Appendix.
Noise and Air Pollution
-
Emissions and noise from vehicles, generators, pumps, etc. minimised using best practice (i.e. engines turned off if not in use, silencers installed, noise abatement fencing in place etc.).
-
Dust controlled using appropriate methods
-
Are the working to agreed hours
Waste Management and Records
-
Quantities / types of waste recorded.
-
Waste transfer notes available on site.
-
Waste types segregated and clearly identified (i.e. bins / skips provided & labelled including recycling facilities).