Title Page

  • Conducted on

  • Shift:

Production Audit

Team A: (MB,HM, Blenders, Line 6A/B)

  • 1.) Masterbatch: All batch sheets being filled out properly. (Ex .initialed, pounds weighed, supervisor/operator sign off, bin numbers, locations wrote down)

  • 2.) Masterbatch: Materials being stored properly, lids on barrels, clips on open bag, etc. (address any issues)

  • 3.) Masterbatch: The area is in good order (floor, tool board, lids closed on vessels not in use) (address any issues)

  • 4) Do the Operator(s) have any concerns at the end of their shift?

End of Shift: (6B/HM/Blending)

  • Line 6B:

  • MB/Blending:

  • HM:

Team B (Line 3)

  • 1.) Line 3: Running to rate? The extruder audit sheet being filled out, any items out of tolerance.

  • 2.) Line 3: Pellet quality assurance (Pellet Count) form filled out.

  • 3.) Overall cleanliness of Team B (address any issues)

  • 4.) Do the Operator(s) have any concerns (Safety, Quality, Production, etc.)

End of Shift: (Line 3)

  • Line 3:

Team C (Line 4)

  • 1.) Line 4: Process Audit sheet being filled out completely, any items out of tolerance (if so address)

  • 2.) Line 4: Pellet quality assurance (Pellet count)form filled out correctly.

  • 3) Line 4 : Process Sheet: are the raw materials being used correct? Percentages correct on computer vs Process Sheet?

  • 4.) Line 4: Raw Material Locator Sheets being filled out correctly with initials and weights/lot# used. (issues have operator correct)

  • 5.) Line 4: Running to Rate, if not what are the factors

  • 6.) Line 4: Process Sheet are the Special Instructions being followed. (Ex.Foil liner)

  • 7.) Quench Tank and purge pan on Line 4, being used? (if not address immediately)

  • 8.) Overall cleanliness of Line 4 and mezzanine? (address any issues)

  • 9.) Does the Line 4 Operator have any concerns at the end of their shift?

End of Shift: Line 4

  • Line 4:

Team C (Line 4A)

  • 1) Line 4A: Process Sheet: are raw material being used correct? Percentages correct on computer vs Process Sheet?

  • 2.) Line 4A; Running to Rate, if not what are the factors

  • 3.) Line 4A: Process Audit sheet being filled out completely, any items out of tolerance (if so address)

  • 3.) Line 4A: Raw Material Locator Sheets being filled out correctly with initials and weights/lot # used (issues have operators correct)

  • 4.) Line 4A: Pellet quality assurance (Pellet count) form filled out correctly.

  • 5.) Line 4A: Process Sheet are the Special Instructions being followed.( Ex. Foil liners)

  • 6.) Quench Tank and purge pans on Line 4A, being used? (if not address immediately)

  • 7.) Overall cleanliness of Line 4A and mezzanine?

  • 8.) Do the Line 4A Operator(s) have any concerns at the end of their shift?

End of Shift: Line 4A

  • Line 4A:

Team C (Line 5)

  • 1.) Line 5: Process Audit sheet being filled out completely, any items out of tolerance (if so address)

  • 2.) Line 5: Raw Material Locator Sheets being filled out correctly with initials and weights/lot # used. (issues have operators correct)

  • 3.) Line 5: Pellet quality assurance(Pellet count)form filled out correctly.

  • 4.) Line 5: Running to Rate, if not what are the factors

  • 5.) Line 5: Process Sheet are the Special Instructions being followed?

  • 6.) Quench Tank and purge pan on Line 5 being used? (if not address immediately)

  • 7.) Overall cleanliness of Line 5 and mezzanine (address any issues)

  • 8.) Do the Line 5 Operator(s) have any concerns at the end of their shift?

End of Shift: Line 5

  • Line 5:

Team D (Line 8)

  • 1) Line 8: Line Audit sheet being filled out, any items out of tolerance (if so address)

  • 2) Line 8: Locator, Solid add, liquid add, and pigment worksheets being filled out properly and correctly.(issues have operators correct)

  • 3) Line 8: Pellet Quality Assurance (Pellet count) form being filled out correctly, any material out of spec.

  • 4) Line 8: Special Instructions (op.10 text) being followed, if not please provide details.

  • 5) Line 8: Is the Line running to rate? if not please provide details.

  • 6.) Line 8: Overall cleanliness of Line 8.

  • 7.) Do the operator(s) have any concerns at the end of their shift?

End of Shift: Line 8

  • Line 8:

Team D (Line 11)

  • 1.) Line 11: Line Audit Quality Audit form being filled out, any items out of tolerance or issues.(if so address)

  • 2.) Line 11: Pellet Quality Assurance (Pellet count) form being filled out correctly , any issues

  • 3.) Line 11: Raw Material Locator Sheets being filled out correctly with initials and weights/lot # used.(issues have operators correct)

  • 4.) Line 11: Is the Line running to rate? if not please provide details.

  • 5.) Line 11: Overall cleanliness of Line 11 (address any issues)

  • 6.) Quench Tanks: on Line 11 and being used?

  • 7.) Do the operator(s) have any concerns at the end of their shift?

End of Shift: Line 11

  • Line 11:

3D Area, Quench Area

  • 1) Filament (3D): Spot check 3 completed spools to confirm labels are correct

  • 2.) Do the 3D operator(s) have any concerns at the end of their shift?

Quench Area

  • 1.) Quench Area: Organized ,Chunk boxes labeled and not full, any Tanks need emptied? (Address any issues)

Positive safety observation noticed

  • 1.)Witnessed the below positive observation

COMPLETED BY

  • Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.