Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Cell and test details
-
Customer
-
Cell part number
-
Cell serial number
-
Nameplate photo
-
Test technician
-
Test date
-
Repair job number
3 minute rectifier load test
-
L1 amps
-
L2 amps
-
L3 amps
-
Average rectifier current
Preliminary test mode
-
1/3 DC bus volts
-
2/3 DC bus volts
-
3/3 DC bus volts
-
Total DC bus volts
-
Over voltage trip level (Vdc)
-
V_avail trip level (Vdc)
-
Under voltage trip level (Vdc)
-
Control power trip level (Vdc)
IGBT blocking test
-
Input voltage to cell
-
Q1 voltage output
-
Confirm gate LED operation
-
Q2 voltage output
-
Confirm gate LED operation
-
Q3 voltage output
-
Confirm gate LED operation
-
Q4 voltage output
-
Confirm gate LED operation
-
Maximum output voltage (Vac)
Burn in mode
-
Input voltage to cell (Vac)
-
Output current (amps)
-
Out of saturation current (amps)
-
Run for >5 seconds at OOS amps.
-
Over temperature trip level (degrees C)
-
Temperature sense current (amps)
-
One cell tester temperature reading (degrees C)
-
Overall result
-
Technician signature