표제지

  • 수행일

  • 작성자

감사

  • SUMMURY

INSTRUMENT REPORT

  • Before the INSPECTION _INSTRUMENT VALIDATION

  • VALIDATION FAILED? WHICH STEP?

  • How did you solve the problems?(error code)

  • After the INSPECTION_INSTRUMENT VALIDATION

INSTRUMENT HISTORY

  • Backingline pressure _Closed (mtorr)

  • UPS Chamber Vacuum(torr)

  • DWS Chamber Vacuum(torr)

  • Source pressure(Set/Reading)

  • Valve V13(%)

  • AIR Pressure(Set/Reading)

  • Detector Voltage(Set/Reading)(KV)

  • Flowtube Pressure (Closed/Open)(mtorr)_Inlet block check

  • Injection Scan ( H3O+/NO+/O2+)(nA)

  • Tune on Reagent Scan (( H3O+/ NO+/ O2+)

  • SIM Negative Scan_DRY(O-, NO2-)

  • SIM Negative Scan_Wet (OH-,O2-)

  • UPS LENS_Lens 1 / Lens 2 / Lens 3/Lens 4 / Prefilter / Axial bias / Lens5 / Lens 6 / LensE / FT

  • DWS LENS_Lens E/ Lens1/ IG Bias / IG RF / Lens2 / Lens3/ Lens4 / Prefilter / Axial Bias / Lens 5

  • DWS VALIDATION COUNT(19,28,78,106,150,186,236)

  • DATA Storage (df .)

  • Remaining amount of STADARD GAS

  • Special NOTE

  • ATTACHMENT

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.