표제지
-
수행일
-
작성자
감사
-
SUMMURY
INSTRUMENT REPORT
-
Before the INSPECTION _INSTRUMENT VALIDATION
-
VALIDATION FAILED? WHICH STEP?
- RESET QUAD
- Carrier Gas
- DWS Pressure
- Sample Flow
- UPS Scanline
- DWS Scanline
- Detector Verification
- Detector linearity
- Standard Validation
- Background
-
How did you solve the problems?(error code)
-
After the INSPECTION_INSTRUMENT VALIDATION
INSTRUMENT HISTORY
-
Backingline pressure _Closed (mtorr)
-
UPS Chamber Vacuum(torr)
-
DWS Chamber Vacuum(torr)
-
Source pressure(Set/Reading)
-
Valve V13(%)
-
AIR Pressure(Set/Reading)
-
Detector Voltage(Set/Reading)(KV)
-
Flowtube Pressure (Closed/Open)(mtorr)_Inlet block check
-
Injection Scan ( H3O+/NO+/O2+)(nA)
-
Tune on Reagent Scan (( H3O+/ NO+/ O2+)
-
SIM Negative Scan_DRY(O-, NO2-)
-
SIM Negative Scan_Wet (OH-,O2-)
-
UPS LENS_Lens 1 / Lens 2 / Lens 3/Lens 4 / Prefilter / Axial bias / Lens5 / Lens 6 / LensE / FT
-
DWS LENS_Lens E/ Lens1/ IG Bias / IG RF / Lens2 / Lens3/ Lens4 / Prefilter / Axial Bias / Lens 5
-
DWS VALIDATION COUNT(19,28,78,106,150,186,236)
-
DATA Storage (df .)
-
Special NOTE
-
ATTACHMENT