Information
-
Silo offload audit
-
Document No.
-
Conducted on
-
Prepared by
Silo
-
Silo location
- CC Lime #2 (ET)
- RLC Cement
- RLC Flyash
- RLC Lime
- CC Cement
- CC Flyash
- CC Lime #1 (autoclave)
- Lafarge Cement #1
- Lafarge Cement #2
- Lafarge Flyash
-
Silo level
-
Proper silo for the product in the truck
-
Does it appear like the load will fit in the silo
-
Any problems with the silo or instrumentation
-
Enter details
Does the driver have the proper PPE on?
-
Hard hat
-
Safety glasses
-
Safety boots
-
Hearing protection
-
Reflective striping
-
Appropriate clothing
-
Barricades in place
Driver & Truck
-
Is the driver paying attention to the process
-
Has the driver had site induction
-
Has the driver reviewed our silo offload procedure
-
Does the truck have a back up alarm
-
Truck number
-
Is this a quiet truck or a loud truck
Other
-
Any other issues to report
-
Enter details