Information

  • Site conducted

  • Site Stage

  • Description of Building Activities

  • Conducted on

  • Conducted By:

Safety Documentation

  • Is the Safety Management Plan for this project onsite?

  • Timeframe for Rectification

  • Are SWMS being provided for all High Risk Activities?

  • Timeframe for Rectification

Fall Protection

  • Are perimeter of floors adequately protected?

  • Timeframe for Rectification

  • Are all ladders onsite industrial rated?

  • Timeframe for Rectification

  • Are all roof edges protected when works occurring on them?

  • Timeframe for Rectification

  • Are all stair voids protected?

  • Timeframe for Rectification

  • Are excavation perimeters greater than 1500mm deep protected?

  • Timeframe for Rectification

Scaffolding

  • Is ladder access provided for workings decks?

  • Timeframe for Rectification

  • Is scaffold above 2.0m fitted with guardrail?

  • Timeframe for Rectification

  • Are all planks, guardrails, and toeboards secure?

  • Timeframe for Rectification

  • Is there a handover certificate or tag affixed to the scaffold?

  • Timeframe for Rectification

Electrical

  • Are all electrical tools and leads tested and tagged within the last 3months?

  • Timeframe for Rectification

  • Are all generators fitted with a 30ma RCD?

  • Timeframe for Rectification

  • Are all leads raised / positioned out of the way? (Lead stands or hooks)

  • Timeframe for Rectification

Public Protection

  • Is the perimeter fencing secured?

  • Timeframe for Rectification

  • Is all applicable signage displayed?

  • Timeframe for Rectification

House Keeping

  • Is the site clean and clear of rubbish / scattered materials?

  • Timeframe for Rectification

  • Are roads, paths and houses cleaned as work is completed?

  • Timeframe for Rectification

  • Is there adequate sediment controls in place?

  • Timeframe for Rectification

Plant & Equipment

  • Safe movement of plant and equipment around site? <br>Safety spotter, flashing beacon, reverse alarm, mirrors

  • Timeframe for Rectification

  • Are all operators licensed and/or have a VOC for the plant being used?

  • Timeframe for Rectification

  • Is plant in good working order?<br>Visual inspection for oil leaks, seatbelt, roll cage, tyres, tracks, etc

  • Timeframe for Rectification

  • Is safe working load clearly visible on crane booms?

  • Timeframe for Rectification

Trenching & Excavations

  • Are all trenches /excavations safely shored and/or battered?

  • Timeframe for Rectification

  • Are barricades in place around open trenching?<br>Must be in place where the trench is greater than 1500mm deep

  • Timeframe for Rectification

  • Is access adequately restricted to those workers directly involved in the works being conducted?

  • Timeframe for Rectification

  • Are underground services identified before trenching / excavation?<br>Examples:<br>Dial before you dig<br>As built checks<br>Ground penetrating radar

  • Timeframe for Rectification

General Safety

  • Are all workers wearing high visibility clothing?

  • Timeframe for Rectification

  • Are amenities accessible and clean?

  • Timeframe for Rectification

  • Is there a fully stocked first aid kit onsite?

  • Timeframe for Rectification

  • Is there a qualified first aided onsite?

  • Timeframe for Rectification

  • Were there any injuries or incidents since last audit?

  • Timeframe for Rectification

  • Is there adequate fire protection onsite?<br>At least one class ABE extinguisher (either new to service or tested in last 6months)<br>More may be required on larger sites

  • Timeframe for Rectification

Completion

  • Is there any outstanding items from last audit?

  • undefined

  • Remarks:

  • Auditor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.