Information
-
Site conducted
-
Site Stage
-
Description of Building Activities
-
Conducted on
-
Conducted By:
- Sean Kenny COHSPrac - National WHS Manager
- Quentin Caple COHSPrac -OH&S Consultant
- Other
Safety Documentation
-
Is the Safety Management Plan for this project onsite?
-
Timeframe for Rectification
-
Are SWMS being provided for all High Risk Activities?
-
Timeframe for Rectification
Fall Protection
-
Are perimeter of floors adequately protected?
-
Timeframe for Rectification
-
Are all ladders onsite industrial rated?
-
Timeframe for Rectification
-
Are all roof edges protected when works occurring on them?
-
Timeframe for Rectification
-
Are all stair voids protected?
-
Timeframe for Rectification
-
Are excavation perimeters greater than 1500mm deep protected?
-
Timeframe for Rectification
Scaffolding
-
Is ladder access provided for workings decks?
-
Timeframe for Rectification
-
Is scaffold above 2.0m fitted with guardrail?
-
Timeframe for Rectification
-
Are all planks, guardrails, and toeboards secure?
-
Timeframe for Rectification
-
Is there a handover certificate or tag affixed to the scaffold?
-
Timeframe for Rectification
Electrical
-
Are all electrical tools and leads tested and tagged within the last 3months?
-
Timeframe for Rectification
-
Are all generators fitted with a 30ma RCD?
-
Timeframe for Rectification
-
Are all leads raised / positioned out of the way? (Lead stands or hooks)
-
Timeframe for Rectification
Public Protection
-
Is the perimeter fencing secured?
-
Timeframe for Rectification
-
Is all applicable signage displayed?
-
Timeframe for Rectification
House Keeping
-
Is the site clean and clear of rubbish / scattered materials?
-
Timeframe for Rectification
-
Are roads, paths and houses cleaned as work is completed?
-
Timeframe for Rectification
-
Is there adequate sediment controls in place?
-
Timeframe for Rectification
Plant & Equipment
-
Safe movement of plant and equipment around site? <br>Safety spotter, flashing beacon, reverse alarm, mirrors
-
Timeframe for Rectification
-
Are all operators licensed and/or have a VOC for the plant being used?
-
Timeframe for Rectification
-
Is plant in good working order?<br>Visual inspection for oil leaks, seatbelt, roll cage, tyres, tracks, etc
-
Timeframe for Rectification
-
Is safe working load clearly visible on crane booms?
-
Timeframe for Rectification
Trenching & Excavations
-
Are all trenches /excavations safely shored and/or battered?
-
Timeframe for Rectification
-
Are barricades in place around open trenching?<br>Must be in place where the trench is greater than 1500mm deep
-
Timeframe for Rectification
-
Is access adequately restricted to those workers directly involved in the works being conducted?
-
Timeframe for Rectification
-
Are underground services identified before trenching / excavation?<br>Examples:<br>Dial before you dig<br>As built checks<br>Ground penetrating radar
-
Timeframe for Rectification
General Safety
-
Are all workers wearing high visibility clothing?
-
Timeframe for Rectification
-
Are amenities accessible and clean?
-
Timeframe for Rectification
-
Is there a fully stocked first aid kit onsite?
-
Timeframe for Rectification
-
Is there a qualified first aided onsite?
-
Timeframe for Rectification
-
Were there any injuries or incidents since last audit?
-
Timeframe for Rectification
-
Is there adequate fire protection onsite?<br>At least one class ABE extinguisher (either new to service or tested in last 6months)<br>More may be required on larger sites
-
Timeframe for Rectification
Completion
-
Is there any outstanding items from last audit?
-
undefined
-
Remarks:
-
Auditor: