Information

  • Project:

  • Location:

  • Client:

  • Foreman:

  • Crew Members:

  • Project Manager:

  • Supervisor:

  • Conducted on:

  • Auditor:

  • Score:

Amenities/Offices (Offices, foreman container / compound)

  • Amenities and facilities are adequate for the project?

  • Site safety notice board set up and info displayed

  • Company policies displayed.

  • Electrical appliances are tested and tagged

  • Emergency evacuation plan and procedures displayed.

  • Emergency Evacuation drill completed in past 6 months

  • Emergency contact details displayed

  • Nearest Medical facility & Doctor location displayed

  • Good house keeping

  • Appropriate signage displayed

  • Lunch area clean and tidy

  • Toilets are clean & tidy and paper and soap available (weekly cleaned)

  • Sediment controls outside compound

  • EMP in place and impact map displayed.

  • Dust control in place.

First Aid Facilities

  • First Aid kit available and fully stocked

  • Site First Aid Risk assessment completed.

  • DRABCD chart displayed

  • If you are injured poster displayed

  • All incident and observation reports complete and given to OH&S department

  • Facility identified by appropriate first aid symbol

  • Appropriate number of First Aiders on site ( 2 per crew) minimum.

Fire Safety

  • Fire fighting equip, in place, serviced and dated

  • Equipment identified by symbol

Records - Comdain

  • Site PSMP / IMS procedures on site

  • All Site Personnel have been inducted with details of relevant qualifications recorded

  • Toolbox meeting records up to date - crew has been given weekly toolbox talk?

  • SWMS available and signed for all tasks.

  • For all medium-high risk activities and signed by work party.

  • JSA available?

  • Is a updated risk assessment available for the project

  • Daily Pre Start checklist completed sign by work party

  • Are appropriate checklists and permits available e.g. Confined space/hot works/excavations?

Sub-contractors

  • Is the IMS available at site for all subcontractors?

  • Has sub-contractors SWMS been reviewed and approved by Comdain.

  • All sub-contractor SWMS and safety plans available on site.

  • Are all Subby SWMS signed by their own employees on site?

  • Are all sub contractors inducted and details recorded?

Site - site well delineated.

  • Materials stacked safely e.g. Pipes, fittings, covers, etc

  • Barrier mesh has been erected to identify unsafe areas

  • Sharp objects capped e.g. Star Pickets

  • Appropriate site entry signs displayed

  • All boundaries are secured by fencing etc

  • All site access ways are clear

  • Adequate lighting in all areas

  • Good house keeping

  • All power tools sighted are in good working order.

  • Pedestrian control and access adequate

PPE adhering to Comdain PPE requirements

  • All employees wearing appropriate PPE?

  • UV Protection available e.g. (Sunscreen & Glasses).

  • Ear protection used?

  • Extra high impact face protection used as necessary?

Plant and Equipment

  • Daily Inspection checklists completed by the operators on plant

  • All plant items have flashing lights and reversing beepers

  • All plant risk assessments records on site e.g. pumps and excavators

  • All areas where plant operating are barricaded off or under traffic management

  • Spotters are used where required - is there a designated spotter in place?

  • Are plant items suitable for the task being performed

  • Is plant being used correctly at site

  • Do operators hold appropriate tickets / VOC for operating plant / equipment

Excavations, Barricades and DBYD

  • All excavations greater than 1.4m depth battered or shored

  • Is up to date DBYD on site (with 28 days)

  • Excavations appropriately barricaded and signed

  • Plant & Equip not working within the zone of influences

  • Materials stored outside the zone of influences

  • Edges protection in place

  • Shields are in good condition with all pins and safety pins intact and fit for purpose.

  • Is there suitable access to the trench, i.e. ladders?

Hazardous Substances

  • SDS available for all hazardous substances (SDS within five years).

  • Hazard substance register current

  • All containers labeled

  • All hazard substance stored appropriately in ventilated area.

  • Spill containment kits available and adequate for site

Traffic Control

  • Is a traffic management plan and necessary permit in place?

  • Are Traffic Control devices (signs, bollards etc) being used in accordance with TMP

  • Are staff qualified and competent to direct traffic?

  • Are all work areas secured from the public & pedestrians protected.

  • Checklist complete C1-SP-06-F2 (three times daily)

Lifting Equipment

  • Slings have information tags

  • Lifting chains have been tested and tagged (within one year)

  • Lifting hook and shackles are tested and tagged (within one year)

  • Has the lifting register been complete (C1-SP-07-F2)

  • Equipment inspected by qualified dog before use

  • Only lifting equipment to be used within SWL.

  • All lifting equipment in good condition.

Asbestos Removal

  • Form 65 complete for removal works <10 sq metres

  • All people involved in the licensed removal work are in procession of CPCCDE3015A

  • All people inducted into CEP

  • Relevant paperwork in place.

  • Clearance certificate in place

  • Barricades and signage in place

  • PPE in use

  • All asbestos wrapped and secured

  • Adequate removal techniques used - dust kept to a minimum.

Electrical Safety

  • Earth leakage used on generators (RCD protection used).

  • Leads are elevated where appropriate.

  • Testing/Tagging up to date.

  • Temporary Power boxes/generators located clear of hazard, tagged and securely fixed and fire extinguisher close.

  • Electrical register available and current

  • All electrical equipment in good condition.

Environmental

  • Is the project within a fire ant area.

  • Surveillance program is in place.

  • All paperwork in place.

Formwork / Reinstatement - sediment controls in place?

  • Edge protection is provided to decks and platforms

  • PPE used?

  • Engineers certificates available for all pours

  • All penetrations covered or hand rails erected to prevent falls

  • Washing area for tools and equipment is in place.

  • Roe/star picket & other protrusion capped to prevent injury

  • A safe work procedure is on site for all Formwork activities

Confined Space

  • Employees entering a Confined space been adequately trained.

  • Has a confined space Risk Assessment been developed?

  • Has a confined space permit been issued?

  • Has a rescue plan been developed?

  • Has the rescue plan been rehearsed at site?

  • Emergency equipment available?

Work at Heights

  • Appropriate fall protection across the site?

  • Scaffolding to min requirements (AS4576)?

  • Are all mobile Tower Scaff erected to min standards?

  • Are scaffold tags or sign offs available?

  • Scaffolds are stored appropriately?

  • Where a Harness is being used has training been provided?

  • Are all stair voids & penetrations covered?

  • Appropriate use of ladders being applied on site?

Additional Comments / Site finding

Signatures

  • Auditor's Printed Name & Signature

  • Site Foreman Printed Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.