Information
-
Project:
-
Location:
-
Client:
-
Foreman:
-
Crew Members:
-
Project Manager:
-
Supervisor:
-
Conducted on:
-
Auditor:
-
Score:
Amenities/Offices (Offices, foreman container / compound)
-
Amenities and facilities are adequate for the project?
-
Site safety notice board set up and info displayed
-
Company policies displayed.
-
Electrical appliances are tested and tagged
-
Emergency evacuation plan and procedures displayed.
-
Emergency Evacuation drill completed in past 6 months
-
Emergency contact details displayed
-
Nearest Medical facility & Doctor location displayed
-
Good house keeping
-
Appropriate signage displayed
-
Lunch area clean and tidy
-
Toilets are clean & tidy and paper and soap available (weekly cleaned)
-
Sediment controls outside compound
-
EMP in place and impact map displayed.
-
Dust control in place.
First Aid Facilities
-
First Aid kit available and fully stocked
-
Site First Aid Risk assessment completed.
-
DRABCD chart displayed
-
If you are injured poster displayed
-
All incident and observation reports complete and given to OH&S department
-
Facility identified by appropriate first aid symbol
-
Appropriate number of First Aiders on site ( 2 per crew) minimum.
Fire Safety
-
Fire fighting equip, in place, serviced and dated
-
Equipment identified by symbol
Records - Comdain
-
Site PSMP / IMS procedures on site
-
All Site Personnel have been inducted with details of relevant qualifications recorded
-
Toolbox meeting records up to date - crew has been given weekly toolbox talk?
-
SWMS available and signed for all tasks.
-
For all medium-high risk activities and signed by work party.
-
JSA available?
-
Is a updated risk assessment available for the project
-
Daily Pre Start checklist completed sign by work party
-
Are appropriate checklists and permits available e.g. Confined space/hot works/excavations?
Sub-contractors
-
Is the IMS available at site for all subcontractors?
-
Has sub-contractors SWMS been reviewed and approved by Comdain.
-
All sub-contractor SWMS and safety plans available on site.
-
Are all Subby SWMS signed by their own employees on site?
-
Are all sub contractors inducted and details recorded?
Site - site well delineated.
-
Materials stacked safely e.g. Pipes, fittings, covers, etc
-
Barrier mesh has been erected to identify unsafe areas
-
Sharp objects capped e.g. Star Pickets
-
Appropriate site entry signs displayed
-
All boundaries are secured by fencing etc
-
All site access ways are clear
-
Adequate lighting in all areas
-
Good house keeping
-
All power tools sighted are in good working order.
-
Pedestrian control and access adequate
PPE adhering to Comdain PPE requirements
-
All employees wearing appropriate PPE?
-
UV Protection available e.g. (Sunscreen & Glasses).
-
Ear protection used?
-
Extra high impact face protection used as necessary?
Plant and Equipment
-
Daily Inspection checklists completed by the operators on plant
-
All plant items have flashing lights and reversing beepers
-
All plant risk assessments records on site e.g. pumps and excavators
-
All areas where plant operating are barricaded off or under traffic management
-
Spotters are used where required - is there a designated spotter in place?
-
Are plant items suitable for the task being performed
-
Is plant being used correctly at site
-
Do operators hold appropriate tickets / VOC for operating plant / equipment
Excavations, Barricades and DBYD
-
All excavations greater than 1.4m depth battered or shored
-
Is up to date DBYD on site (with 28 days)
-
Excavations appropriately barricaded and signed
-
Plant & Equip not working within the zone of influences
-
Materials stored outside the zone of influences
-
Edges protection in place
-
Shields are in good condition with all pins and safety pins intact and fit for purpose.
-
Is there suitable access to the trench, i.e. ladders?
Hazardous Substances
-
SDS available for all hazardous substances (SDS within five years).
-
Hazard substance register current
-
All containers labeled
-
All hazard substance stored appropriately in ventilated area.
-
Spill containment kits available and adequate for site
Traffic Control
-
Is a traffic management plan and necessary permit in place?
-
Are Traffic Control devices (signs, bollards etc) being used in accordance with TMP
-
Are staff qualified and competent to direct traffic?
-
Are all work areas secured from the public & pedestrians protected.
-
Checklist complete C1-SP-06-F2 (three times daily)
Lifting Equipment
-
Slings have information tags
-
Lifting chains have been tested and tagged (within one year)
-
Lifting hook and shackles are tested and tagged (within one year)
-
Has the lifting register been complete (C1-SP-07-F2)
-
Equipment inspected by qualified dog before use
-
Only lifting equipment to be used within SWL.
-
All lifting equipment in good condition.
Asbestos Removal
-
Form 65 complete for removal works <10 sq metres
-
All people involved in the licensed removal work are in procession of CPCCDE3015A
-
All people inducted into CEP
-
Relevant paperwork in place.
-
Clearance certificate in place
-
Barricades and signage in place
-
PPE in use
-
All asbestos wrapped and secured
-
Adequate removal techniques used - dust kept to a minimum.
Electrical Safety
-
Earth leakage used on generators (RCD protection used).
-
Leads are elevated where appropriate.
-
Testing/Tagging up to date.
-
Temporary Power boxes/generators located clear of hazard, tagged and securely fixed and fire extinguisher close.
-
Electrical register available and current
-
All electrical equipment in good condition.
Environmental
-
Is the project within a fire ant area.
-
Surveillance program is in place.
-
All paperwork in place.
Formwork / Reinstatement - sediment controls in place?
-
Edge protection is provided to decks and platforms
-
PPE used?
-
Engineers certificates available for all pours
-
All penetrations covered or hand rails erected to prevent falls
-
Washing area for tools and equipment is in place.
-
Roe/star picket & other protrusion capped to prevent injury
-
A safe work procedure is on site for all Formwork activities
Confined Space
-
Employees entering a Confined space been adequately trained.
-
Has a confined space Risk Assessment been developed?
-
Has a confined space permit been issued?
-
Has a rescue plan been developed?
-
Has the rescue plan been rehearsed at site?
-
Emergency equipment available?
Work at Heights
-
Appropriate fall protection across the site?
-
Scaffolding to min requirements (AS4576)?
-
Are all mobile Tower Scaff erected to min standards?
-
Are scaffold tags or sign offs available?
-
Scaffolds are stored appropriately?
-
Where a Harness is being used has training been provided?
-
Are all stair voids & penetrations covered?
-
Appropriate use of ladders being applied on site?
Additional Comments / Site finding
Signatures
-
Auditor's Printed Name & Signature
-
Site Foreman Printed Name & Signature