Information
-
Site
-
Conducted on
-
Audit Number
-
Prepared by
-
Document No.
Previous Report
-
Results From Previous Audit
Health & Safety Documentation
-
Construction Management Plan
-
Corrective Action Register
-
Electrical Certificates
-
Fire & Emergency Procedures
-
Incident & Non Conformance Register
-
Permits
-
Plant & Lifting Equipment Certification
-
Plant Inspection Records
-
Scaffold Register
-
Sign In Book
-
Site Induction
-
SQE Reports
-
Statutory Notices
-
Temporary Works
-
Toolbox Talks
-
Traffic Management Plan
-
Work Method Statements & Job Safety Analysis
-
Excavations
Site Arrangements
-
Electrical Safety
-
Fire Extinguishers / Horn
-
First Aid
-
Housekeeping
-
Lighting
-
Parking
-
Plant & Machinery
-
Podium / Step Ladders
-
PPE
-
Scaffold
-
Security
-
Signage
-
Site Fencing / Hording
-
Storage
-
Subcontractor Equipment
-
Vehicle / Pedestrian Segregation
-
Welfare Facilities
-
Other
-
Other
-
Other
-
Other
Environmental
-
Flora and fauna management.
-
Noise and vibrations.
-
Management of site water. Concrete wash down areas, cutting/drilling slurries etc
-
Dust control and air quality.
-
Fuel, chemicals, and hazardous materials being managed appropriately? i.e. spill kits available and fully stocked.
-
Waste management. Is site generated waste being managed appropriately?
-
Contaminated areas identified and managed appropriately?
-
Heritage and indigenous areas being protected or avoided?
-
Erosion and sediment controls in place? If installed, are they in good order?
Additional Comments
Corrective Actions
-
High Risk NCs to be closed by
-
Medium Risk NCs to be closed by
-
Low Risk NCs & OBS to be closed by
Sign Off
-
I confirm I have had the contents of this audit explained to me
-
Site Manager
-
Person Conducting The Inspection
-
All corrective actions must be signed off and dated once completed.