Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Areas observed
-
Personnel
Documentation
-
Is previous report closed out?
-
Are statutory notices displayed?
-
Is F10 on display?
-
Is the construction plan being reviewed regularly?
-
Are inductions being carried out, including visitors induction?
-
Are there suitable arrangements in place for communicating with non-English speaking personnel?
-
Are competence cards checked and up to date?
-
Are risk assessments / method statements adequate and site specific?
-
Are assessments being communicated to the workforce?
-
Are registers and daily checks being maintained?
-
Are permits in use and up to date?
Site set-up
-
Is traffic management in place and adequate?
-
Is public protection adequate?
-
Is there adequate ballast on the site hoarding?
-
Is the site welfare adequate, clean and tidy?
-
Is site housekeeping in good order?
-
Are roads kept clear of debris and mud?
-
Has a suitable smoking area been designated?
-
Is there adequate signage?
-
If edge protection is required, is it in place and adequate?
Emergency planning
-
Is a fire risk assessment in place and up to date?
-
Are fire safety precautions adequate and in date?
-
Has a fire drill been carried out?
-
Are access / emergency routes clear?
-
Is lighting, including emergency lighting adequate?
-
Are first aid arrangements adequate?
Working at Height
-
Is roof work being carried out safely and correctly?
-
Is there adequate roof edge protection in place?
-
Are permits in place?
-
Is scaffolding being used safely and correctly?
-
Is it complete, adequate and in good condition?
-
Are weekly inspections being carried out by competent a person?
-
If scaffold has been designed is sign off in place?
-
Are MEWPS being used safely and correctly?
-
Are rescue plans in place?
-
Are harnesses in place and clipped on where required?
-
Is harness training in place?
-
Have harness checks been carried out?
-
Are keys removed when not in use?
-
Are towers being used safely and correctly?
-
Are they adequate for task?
-
Are podiums / ladders being used safely and correctly?
-
Is ladder permit in place?
-
Are they correct for task and in good condition?
Plant and Equipment
-
Is plant and machinery in good condition?
-
Are daily / weekly checks being carried out?
-
Are lifting operations being carried out safely and correctly?
-
Are lifting plans and test certification in place?
-
Are excavations being carried out safely and correctly?
-
Have underground services been identified and isolated prior to work commencing?
-
Are permits in place?
Electrical work
-
Is electrical work being carried out safely and correctly?
-
Are relevant permits in place?
-
Is the electrical safety certificate in place for temporary electrics?
-
Are leads and cables protected from damage and installed in a manner to prevent trips and falls?
-
Is PAT testing up to date?
Health and Wellbeing
-
Is PPE adequate for task and in good condition?
-
Are COSHH assessments in place and adequate?
-
If COSHH, flammable or explosive substances are on site are they stored correctly?
-
Asbestos.
-
Are registers and controls in place?
-
Noise levels controlled?
-
Have mechanical means of material handling been considered to eliminate manual handling?
-
Is manual handling being carried out correctly?
-
HAVS.
-
Have triggers times been determined and informed to operatives?
-
Are vibration ratings known for equipment on site (has the HSE ready reckoner and vibration calculator been used)?
Environmental
-
Is SWMP being maintained?
-
Are the waste management / carriers licence and full insurances on display?
-
Identification of waste.
-
Segregation on / off site?
-
Is hazardous waste correctly managed?
-
Is dust being adequately controlled?
-
Is scrap being disposed of in accordance with company policy?
-
Is there a danger of water pollution?
-
Are measures in place to prevent contamination?
-
Is spill prevention required, adequate and in place?
-
Is there sufficient consideration to protection of ecology?
Additional comments and sign-off
-
Any other comments?
-
Sketch
-
Site manager please sign off once completed.
-
Person conducting audit please sign off once completed.
-
Date and time audit completed.