Title Page
-
Conducted on
-
Prepared by
-
Location
-
Is this report with reference to an FRA
Passive Fire Defect
-
Passive fire defect
Passive fire defect
-
Location of defect
-
Details
-
Type of defect
-
Size of defective area
-
Required solution
Fire door defect
-
Fire door
Fire door repair
-
Defect
- Hinges
- Intumescent seals
- Excessive gaps
- Door closer
- Glazing
-
Location
-
Required repair
- Replacement hinges
- New door set
- Threshold installing
- Replacement closer
- Replacement seals
- Reduction of gaps via frame alteration
-
Compliance (with image)
-
Sizes available
-
Width
-
Height
-
Depth
-
Frame
Other defects
-
Other Defects and compliance
Other defect and compliance
-
Details
-
Location
-
Photo
Required Materials
-
Is a scaffold required
-
How high
-
Is a skip required
-
Can it be located onsite
-
Are triple extensions required
-
How many batt boards are required
-
How many tubes of mastic are required
-
How many tubes of HP are required
-
What other materials are required