Title Page
-
Conducted on
-
Cadent Employee Completing List
- Chris Thomas
- Tony Redman
- Steve Chantry
- Rob Jeffs
- Andy Wicks
- Tina Sadiq
- Luke Swinburn
-
Location
-
Contractor
-
Name and Personnel Number (if available)
-
Project Title
-
Work Order/ Site Reference / Marker Post ID
Clarity About the Job Sections (A-B)
-
Are Roles and responsibilities, and points of contact clear on site?
-
Why?
-
Is the contractor aware of, and taking account of the key hazards and pre construction information?
-
Why?
-
Is the contractor clear on their scope of work and working to a plan?
-
Why?
-
Are Permitry requirements (inc. SCO) up to date and being adhered to?
-
Why?
-
Are site rules adhered to and understood by the contractor?
-
Why?
-
Is it clear which risks are being managed by Cadent (eg. SCO) and which the contractor are managing?
-
Why?
-
Has the contractor got adequate supervision and monitoring in place?
-
Why?
-
Does the use of any sub-contractors by the contractor appear to be well managed?
-
Why?
Site Area and Handover (sections C-E)
-
Are all site plans accurate and available, including gas and electric drawings (not required for line walking)?
-
Why?
-
Are the vehicles parked correctly and not causing an obstruction?
-
Why?
-
Has appropriate sign, lighting and guarding been utilised on site?
-
Why?
-
Is it clear who is in charge of the work area?
-
Why?
-
Is there evidence of control of safe access and egress and site demarcation?
-
Why?
-
Is there evidence that people coming to site are being inducted?
-
Why?
-
Has the site register been updated? (start and end of the day)
-
Why?
-
Are the welfare facilities appropriate for the work being undertaken?
-
Why?
Emergency Plan (Section F-G)
-
Are the response procedures in place for all identified emergencies?
-
Why?
-
Is there a process in place for reporting injuries?
-
Why?
-
Is a First Aid Kit available and in date?
-
Why?
RAMS Check & Controls (Section H-L)
-
Has the Contractor an up to date Dynamic Risk Assessment that adequately identifies safety and environmental hazards?
-
Why?
-
Does the risk assessment specify adequate CONTROLS and are these controls in place?
-
Why?
-
Are the correct personnel on site and with evidence of the qualifications if required?
-
Why?
-
Can the contractor confirm the correct equipment is being used on site and that any tests or inspections are in date?
-
Why?
-
Can the contractor confirm that the correct plant is being used on site and any maintenance records are in date?
-
Why?
-
Can the contractor confirm the correct PPE is being used?
-
Why?
-
If Temporary works are required, has the temporary works been checked by a competent person, registered on a temporary works register and approved by a competent temporary works coordinator?
-
Why?
-
Are the contractors aware of and working to appropriate policies, procedures and standards specific to the work being undertaken? Is Section M Signed?
-
Why?
Scope or Changes on Site (Section M)
-
Have any Changes of Scope by Cadent been actioned appropriately?
-
Why?
-
Does the Contractor know when & how to contact Cadent if things change?
-
Why?
-
Have any changes on site been reflected in the RAMS, pre-authorised in the permitry and appropriately briefed?
-
Why?
-
Signed by Cadent Employee
-
Date/Time
-
Signed By Contractor (I Confirm that all necessary checks have been undertaken on the site and that all relevant paperwork is correct, at the time of this check being undertaken)
-
Date/Time