Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Team Leader/LDP
-
Work Type
RO/NRO
-
RO Post Checks
-
RO Pre start quality
-
Is the Ro Live?
-
NRO Post Checks
-
NRO Pre start quality
-
Is the NRO Live?
-
CP Competency Checks
-
AE Competency Checks
-
Permit for Deep Excavation
-
Cable Avoidance
-
Training Records
PC Roles
-
Discussion held with SDS/SMS
-
MWC Roles Maturity Discussion held with SDS/SMS
Site Arrival
-
Inducted and site register signed?
-
Are safe digging techniques being employed and mark up to a sufficient standard?
Pre Con Pack
-
Are utility drawings in place
-
Vulnerable customer list available?
-
Pre Con risk map available?
CPP
-
Is this correctly completely with the correct names and available on site?
-
Are the team producing all things necessary for pack completion? ie DR4,DAF,SHALLOW MAINS,TEST CERTS,
-
RA's and Permit to dig available?
- Yes
- No
- N/A
Welfare Facilities
-
Drinking Water available?
-
Are facilities fit for purpose and clean?
-
Are there facilities to dry clothing?
-
First aid and eyewash available and in date?
Site Setup
-
Can road users and Pedestrians navigate through the site safely and free from trip hazards/
PPE
-
Is the correct PPE being worn?
-
Task specific PPE available?
-
Is PPE acceptable, clean/not torn.
PLANT AND VEHICLE MANAGEMENT
-
-
Mechanical plant in safe working order/Plant check sheet filled in?
-
Plant/vehicles parked in a safe manner door to footpath, wheels turned to kerb etc?
- Yes
- No
- N/A
-
Are trailers safely parked and chocks used?
-
SSW for plant being adhered to/ Banksman for excavators/Grab lorry's
Fatigue Management
-
Are the Team aware of their LDP fatigue management systems
-
Are the team aware of the LDP HAVS management system and is it being followed?
EMERGENCY PROCEDURES
-
Are the team aware of the Gas escape procedure if found/reported to them?
-
Have the team got access to Hazard/Near Miss reporting system?
PIPE AND FITTINGS
-
Are pipe and fittings being stored correctly, Dry stored and no open fittings or open ends on service pipe?
-
Is there a reasonable amount of fittings onsite to complete the task, No large access of fittings onsite.
MSL/1 COMPLIANCE
-
Are works being completed to Cadent standards/Procedures?
SAFETY EQUIPMENT
-
Are the extinguishers in good condition,pressurised and within inspection date?
-
Are there enough extinguishers available to cover span of works?
-
Are Dust masks available/in date and fit for use?
-
Can operatives demonstrate how to carry out equipment checks?
-
Are face fit certs available? BA/Dust masks
-
Is the Team clean shaven?
SERVICE LAYING AND TESTING
-
Are activities being carried out to cadent standards?
-
Service testing being carried out as per Cadent Standards?
MAINS TESTING
-
Are mains testing being carried out to Cadent Procedures?
Continuity Bonds
-
Are the team working on electrical insulation ie IJ's, Standpipe Insulation, Temp con bonds?
NRSWA
-
Is there at least one streetworks card available?
-
Is the Chapter 8 (Redbook) available Oct 13 with June 14 updates? (Paperback or electronically)
-
Does the team understand the permit conditions and are they being followed?
-
Are the correct permit numbers being displayed inc correct contact number?
-
Is the permit in progress and have the contacted planner to check?
-
Spoil away within 24hrs and reinstatement tight up
VYN
-
Can the team demonstrate they are doing a min of 2 VYNS a day
-
SLG as per Redbook?
-
If TM is manned, are the appropriate personnel onsite?
-
Are intelligent lights being used where appropriate