Information
-
Document No.
-
Client / Site
-
Conducted on
-
Conducted by
-
Location
-
Work crew
-
For QLD Motorways projects the environmental inspection must be sent to client within 10 days (refer 18.1(a)(v)
Soil & Sediment
-
Have sediment control measures been implemented?
-
Is acid sulphate soil managed according to Environmental Management Plan?
-
Are controls in place for dewatering?
Fire Ant Management Sovereign Energy approved plan: ARMP 3311
-
Have controls for Fire Ant Management been implemented?
-
List sites inspected for fire ants (required every 28 days)
-
Is there signs of suspect ants?
-
Provide location of site inspected
-
Take photo's of locations and suspect fire ant nests if safe.
Hazardous Materials
-
Are vehicles refuelled according to procedure?
-
Are oil spill kits available onsite?
-
Are crews aware of procedure in case of asbestos contamination?
-
Are hazardous material used, stored and disposed according to SDS?
-
Take photos of site
-
Record details of actions required
-
Signature of auditor
Supervisor must be notified of contamination in order to notify the client.
-
Does the client need to be notified under the contract?
-
Does the client need to be notified?
Yes, No
-
Expected delay?
-
Brief details of expected delay.
-
Estimated cost to deal with contamination?