Information

  • Document No.

  • Client / Site

  • Conducted on

  • Conducted by

  • Location
  • Work crew

  • For QLD Motorways projects the environmental inspection must be sent to client within 10 days (refer 18.1(a)(v)

Soil & Sediment

  • Have sediment control measures been implemented?

  • Is acid sulphate soil managed according to Environmental Management Plan?

  • Are controls in place for dewatering?

Fire Ant Management Sovereign Energy approved plan: ARMP 3311

  • Have controls for Fire Ant Management been implemented?

  • List sites inspected for fire ants (required every 28 days)

  • Is there signs of suspect ants?

  • Provide location of site inspected
  • Take photo's of locations and suspect fire ant nests if safe.

Hazardous Materials

  • Are vehicles refuelled according to procedure?

  • Are oil spill kits available onsite?

  • Are crews aware of procedure in case of asbestos contamination?

  • Are hazardous material used, stored and disposed according to SDS?

  • Take photos of site

  • Record details of actions required

  • Signature of auditor

Supervisor must be notified of contamination in order to notify the client.

  • Does the client need to be notified under the contract?

  • Does the client need to be notified?

  • Yes, No
  • Expected delay?

  • Brief details of expected delay.

  • Estimated cost to deal with contamination?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.