Information
-
Document Number: RAMS003 Issue 1
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel Present
-
Document control number RT029 Issue 1
-
Main Contractor
-
Sub Contractors
Access and Working Places
-
Are all access ways clear of obstruction and well lit?
-
Generally are lighting levels adequate?
-
Generally have all edges and openings from which a person can fall, been fitted with guard rails and toe boards?
-
Are access towers / scaffolds erected by competent persons and SCAF tagged?
-
Are ladders or steps class 1 or 2 only, in good order and suitable for the task?
-
Fire action plan, routes and meeting points displayed?
-
Are fire extinguishers in the correct positions, in date and fire points not obstructed?
Health and Safety Documentation
-
Construction phase H&S plan available for inspection?
-
Is the health and safety plan being maintained with:<br> A) Method statements?<br> B) Risk assessments?
-
Is there a general permit to work?
-
Are there specific permits to work e.g. Hot works records?
Plant and Machinery
-
Are dangerous parts of machinery adequately guarded?
-
Are the blades and cutters of woodworking machines suitably guarded and adjusted to within 12mm of the material being processed?
Electrical
-
Is the site electrically isolated, 110v temporary supply installed, bayonet plugs used and are any taped joints observed?
-
Evidence of current PAT testing on equipment?
Certification
-
Are all personnel suitably certified for: abrasive wheels, angle grinders, cartridge tools etc?
-
Is all plant properly certified?
Personal Safety
-
Are safety helmets being worn?
-
Are hi vis vests / jackets being worn?
-
Is safety footwear being worn?
-
On strip out / demolition sites are helmets, safety glasses and gloves being worn?
-
Is suitable PPE as required for specific tasks per RAMS?
-
Is there a trained first aider on site?
-
Is there a fully equipped first aid box on site?
Storage and Site Tidyness
-
Are on site materials stored:<br> A) Tidily?<br> B) Safely?<br> C) is ere evidence of over / unplanned deliveries?
-
Is the site debris / rubbish contained:<br> A) Tidily?<br> B) Safely?
-
Are skips / rubbish containers:<br> A) Positioned safely?<br> B) Loaded safely?<br> C) Fly tipping by others?<br> D) Covered and lockable?
Control of Chemical Substances
-
Have all chemicals been identified and listed?
-
Are all relevant COSHH data sheets available?
-
Are chemical containers suitably identified and labelled?
-
Are hazardous chemicals stored in a secure, safe and flame proof cabinet during periods of non use?
Environmental
-
Materials stored in suitable waste containers
-
Waste transfer notes available?
-
Have toolbox talks / site inductions taken place?
General
-
Is the perimeter of the site clear of obstructions / tools / materials, secure and public property isolated?
-
Is information displayed on or near entrance door e.g. F10, insurance, policy statement, H&S law poster etc?
-
Is the hoarding door robust enough to prevent unauthorised access e.g. Strip down join, bolt and digi lock operable by code only?
-
Are site rules displayed?
-
Proof of site induction e.g. Signed sheet / Helmet stickers?
-
Is the signing in book located near the entrance and is it fully used for both in and out signing?
-
Any other business?
Summary
-
Final Mark
-
Marking Criteria:
0 - 30% = High Risk, halt works until remedial actions taken
40 - 79% = Medium Risk, requires improvement
80 - 100% = Low Risk, excellent -
Actions Required