Title Page
-
Site Name
-
Location
-
Job number
-
Inspection number
-
Client
-
Conducted on
-
Prepared by
-
Security fencing in place?
-
Type of site security fencing/barrier
-
If heras or solid fencing has been used is it double clipped sufficiently?
-
Was the security fencing / hoarding locked and secured sufficiently?
-
Does the security fencing / hoarding have sufficient warning signage attached?
-
Was there any visible sign of damage or forced physical entry to the security fencing / hoarding?
-
Site access safe?
-
Site visually tidy upon entry?
-
Have any voids / trenches / open pits been left in a safe condition?
-
Scaffolding appeared to be in a safe condition? (This is not a seven day check, purely observation during site tour)
-
Scaffolding access made safe?
-
Debris netting / sheeting secure?
-
Evidence of 7 day check available?
-
Buildings / structures / work areas safe and secure?
-
Have open edges been made safe/secure?
-
Are there any over hanging objects or loose items at high level which pose a significant risk of injury or damage?
-
Are there and visible signs of structural movement / fresh cracks? (This is not a calibrated crack survey, purely observation during site tour)
-
Any visible signs of entry / damage / theft / littering / fly tipping / rough sleeping on site?
-
Any visible signs of drug/sex litter or human waste?
-
Services information
-
Observations and comments.
-
Any actions required?
-
Disclaimer
The inspector believes the information contained within this site inspection to be correct at the time of the inspection. The inspector and company will accept no responsibility for any consequences arising from the use of the information herein. The information is based on observations during the site tour on the day and at the time the inspection report was carried out. This report must not be relied upon to have raised all possible hazards on site and can not allow for changes following the time of the report. -
Inspector