Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Documentation / Paperwork
-
Project Induction completed for all personnel
-
Pre Start Meeting held and documented
-
SWMS in place for all activities
-
Hazard Identification undertaken
-
Emergency Controls in place
-
Site Notice Board in place and used
-
Permits e.g. Hot Works, Excavation, Lifting.
-
Plant Records (Inspection / Pre-start checks)
Construction Safety
-
Radio Communication in place and working
-
Hazards identified and clearly marked
-
Edge Protection, Excavations
-
Plant movements monitored
-
Over Head Power Lines identified
-
Plant Operators ticketed and competent
-
Lifting Operations, Crane and Equipment
-
Hazardous Substances store correctly SDS
-
Power Leads off ground
-
Electrical Plant (Earthing / RCD / Condition)
-
Portable Electrical Equipment Test & Tagged
-
Traffic Control personnel and Signage in place
General Site Issues
-
Toilets available on site and clean
-
First Aid kits identified and accessible
-
Fire Protection equipment in place and tagged
-
Manual Handling correctly undertaken
-
Lighting (adequate and angled correctly)
-
Access Route & Walkways
-
Security, Access Gates, Boundary Fencing
-
Site Tidiness Storage / Housekeeping
-
Clean Drinking Water on site
Environmental
-
Noise monitored and controlled
-
Dust monitored and controlled
-
Erosion and Sediment controls installed and maintained
-
Sediment basins are sufficient to retain project water and water quality checks conducted prior to discharging off site
-
Work areas clear of accumulated waste
-
Concrete wash-out area/s are established and adequately maintained maintained
-
Stockpiles 2.5 m or under
-
Spill kits are available, easily accessed and hold all the necessary equipment relevant to the potential spills on the project.
-
Control measures to minimise the risk of the contractor contaminating land and or water have been implemented – e.g. bunded area’s for refuelling
-
Environmental hazards, risks and controls have been identified and documented in the relevant JHA/SWMS.
-
Other
Risk Assessments
-
Are SWMS’s current for all activities?
-
Have all workers signed SWMS?
-
SWMS’s reviewed within last month?
-
Are JHA’s current for activities?
-
Have all workers signed JHA?
-
JHA’s reviewed daily?
Construction Checks
-
Scaffold – Scafftag in place and current
-
Ladders and Access Equipment
-
Protection from falling materials
-
Welding – Screens, Permit in place
-
Flash Back Arrestors fitted reg. end of Oxy Acetylene equipment
-
Small Tools (Condition and Suitability)
-
Site Safety Signage in place and relevant for works in progress
-
Site Signage removed when not required
-
Formwork assembly and stripping
-
Concrete pump set up correctly
-
Workshop area functional and clean
-
Public disturbance monitored
-
Other
Personal Protective Equipment
-
Compliance with Hi-Vis Clothing
-
Compliance with Safety Helmets
-
Compliance with Safety Eye Protection
-
Compliance with Long Sleeve Shirt/Pants
-
Compliance with Hearing Protection
-
Compliance with Gloves
-
Compliance with Ankle High lace up boots
-
Other
Rail Safety Requirements
-
Safe Working requirements are relevant for the work being performed – e.g. Track Force Protection as per the 1994 Book of Rules and Operating Procedures.
-
The person responsible for all Safe Working Requirements holds the necessary qualification to perform such work.
-
Safe Working requirements have been communicated to the workforce and documented accordingly.
-
Where applicable a SAP (Track Occupancy) has been issued by V/Line, is available on site and is current.
-
Has the contractor developed a Rail Safety Management Plan for the project? If so is it project specific?
-
Other
Plant and Equipment
-
Daily Plant/Equipment Prestart completed
-
Permit to Work available in cabin. (where applicable)
-
Amber Beacon operational
-
Reversing alarms operational
-
Operator has current Verification of Competency
-
Current SOP in place for Plant/Equipment. ( where applicable)
Other
-