Title Page
-
Conducted on
-
Prepared by
-
Report Number
-
Location
Site Forms
-
Non - Conformance Reporting
-
Technical Submittal/ O&M
-
Inspection Test Planning
-
Schedule of Finishes and Tolerances
-
Request for Information
Drainage
-
Manhole Install
-
Drainage pipes/ Runs
-
Reinstatement/ Backfill Material
-
Testing
Services
-
Installation
-
Arrangement
-
Indication/ Warning Tapes
-
Depth & Reinstatement
Instrument & Calibration
-
Equipment being logged on schedule
-
Calibration Certificates up to date
-
Monthly Checks Being Complete
Waterproofing & Gas Membrane
-
Operative on site have been Trained for Install
-
Drawings and Details for the works available and signed off.
-
Installation around Piles and Foundation Completed Correctly
-
Lapping of membranes acceptable
-
Waterproofing above ground level installed correctly
-
Cleanliness of area
-
Installation being signed off by Waterproofing supplier
-
Gas Membrane Installation being signed off by third party inspector
-
Outstanding Items on the Reports
Pre Pours
-
Reinforcement Placement
-
Reinforcement Cover
-
Post Tension
-
Cast In
-
Cleanliness
-
Correct Completion & Filing of Pre-Pour sheet
Fire Collars
-
Fire Collar Schedule Being Completed for each floor
-
Fire Collar as-built drawing produced
-
Fire Collar Certificate created for each floor
-
Pictures of installation completed
Post Pour
-
Finish of Slab
-
Finish of Columns
-
Finish of Walls
-
Finish of Stairs
-
Cleanliness
-
Cast ins visually acceptable
Handovers
-
Handover Tracker Complete
-
Handover Tracker Updated
-
Floors Being Snagged and De-snagged by Modebest
-
Client Accepting Floors
-
Handovers of floors inline with programme
As - Built Status
-
Drainage
-
Services
-
Manholes and Pits
-
Slab Edge
-
Penetrations
-
Cast Ins Balcony
-
Cast ins Facade/ Brickwork
-
Columns Top & Bottom
-
Slab Level
-
Upstand Line & Level
Concrete Cubes & Results
-
Cube Shed
-
Slump Tests Completed
-
Cube Temp log Completed
-
28 Day results achieving design strength
Close out items
Report Summary
-
Last Report Closed out
-
Critical Items raised on this report
-
Project Manager Signature