Title Page

  • Conducted on

  • Prepared by

  • Report Number

  • Location

Site Forms

  • Non - Conformance Reporting

  • Technical Submittal/ O&M

  • Inspection Test Planning

  • Schedule of Finishes and Tolerances

  • Request for Information

Drainage

  • Manhole Install

  • Drainage pipes/ Runs

  • Reinstatement/ Backfill Material

  • Testing

Services

  • Installation

  • Arrangement

  • Indication/ Warning Tapes

  • Depth & Reinstatement

Instrument & Calibration

  • Equipment being logged on schedule

  • Calibration Certificates up to date

  • Monthly Checks Being Complete

Waterproofing & Gas Membrane

  • Operative on site have been Trained for Install

  • Drawings and Details for the works available and signed off.

  • Installation around Piles and Foundation Completed Correctly

  • Lapping of membranes acceptable

  • Waterproofing above ground level installed correctly

  • Cleanliness of area

  • Installation being signed off by Waterproofing supplier

  • Gas Membrane Installation being signed off by third party inspector

  • Outstanding Items on the Reports

Pre Pours

  • Reinforcement Placement

  • Reinforcement Cover

  • Post Tension

  • Cast In

  • Cleanliness

  • Correct Completion & Filing of Pre-Pour sheet

Fire Collars

  • Fire Collar Schedule Being Completed for each floor

  • Fire Collar as-built drawing produced

  • Fire Collar Certificate created for each floor

  • Pictures of installation completed

Post Pour

  • Finish of Slab

  • Finish of Columns

  • Finish of Walls

  • Finish of Stairs

  • Cleanliness

  • Cast ins visually acceptable

Handovers

  • Handover Tracker Complete

  • Handover Tracker Updated

  • Floors Being Snagged and De-snagged by Modebest

  • Client Accepting Floors

  • Handovers of floors inline with programme

As - Built Status

  • Drainage

  • Services

  • Manholes and Pits

  • Slab Edge

  • Penetrations

  • Cast Ins Balcony

  • Cast ins Facade/ Brickwork

  • Columns Top & Bottom

  • Slab Level

  • Upstand Line & Level

Concrete Cubes & Results

  • Cube Shed

  • Slump Tests Completed

  • Cube Temp log Completed

  • 28 Day results achieving design strength

Close out items

Report Summary

  • Last Report Closed out

  • Critical Items raised on this report

  • Project Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.