Information

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • SOW?

  • Provide Reasons For Inaccurate/Not Available.

  • Drawings?

  • Provide Reasons For Inaccurate/Not Available.

  • Matrix?

  • Provide Reasons For Inaccurate/Not Available.

Initial Site Walk

  • How Many Booms?

  • 1st Boom Conduit Run

  • 2nd Boom Conduit Run(s)

  • 3rd Boom Conduit Run(s)

  • How Many Led or Flat panels on site?

  • 1st Led or Flat Panel

  • 2nd Led or Flat Panel

  • 3rd Led or Flat Panel

  • Risers present?

  • Access panels?

  • Site?

  • Electric power and communication lines to booms/walls/ceiling are active?

  • Floor work Completed?

  • Add media

  • Speakers

  • Wall Mount?

  • Wall Plates?

  • Doc Station installed?

  • Add media

  • Permanent Lighting installed?

  • Mounting brackets installed for all Stryker equipment? (Wall mounts)

  • Removal of trash?

  • Location of Endo Equipment

  • Devices (Select all that apply)

  • Multiple Vendors?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.