General Site Information
Stage 1: Site Specific Data
-
Document No.
-
Date
-
Job number / Client Site
-
Provide geolocation
-
Site Supervisor / Line Manager
-
Name of Risk Assessor:
-
Others (operatives/ visitors) covered in this risk assessment:
-
Location of Nearest Welfare Facilities
-
Nearest A + E Hospital
Stage 2: Type of Work
-
Does your job acitivity involve Cable Pulling and Roping?
-
Does your job activity involve Underground Work?<br>
-
Does your job activity involve Working at Height?
-
Does your job activity include working at SDU/MDUs
-
Other - Please specify
Stage 3: Who is at Risk?
-
Contractor / Employee
-
Operative Third-Parties
-
Members of the Public
-
Visitors
-
Children / Vulnerable Person
Stage 4: Documentation
-
Is a copy of the RAMS for the task available on-site?
-
Have the RAMS been briefed to all those involved? If no, you cannot continue.
Stage 5: Pre-Start Checks
-
Is there adequate lighting on site whilst operatives are working?
-
Does the team have all the required PPE to complete the job safely? <br>
-
Are all operatives trained and experienced to carry out the job?
- Yes
- No
- N/A
-
Are all relevant tools and equipment available on site?
-
Are the tools and equipment suitable and safe for the intended use? <br>
-
Is the site set up according to the New Roads and Street Works Act 1991 (Red Book)
Stage 6: Does the work involve interaction with any of the following (if "yes", you must stop work and consult your supervisor before progressing)
-
Adverse Weather
-
Contaminated Under/-Ground
-
Asbestos
-
High Speed Road (+40 MpH)
-
Busy Traffic Junction
-
High Public Amenity Area
-
Pedestrian Crossing
-
School / Play Area
-
3d Parties on site
-
Deliveries - Moving Vehicles
-
Poor / Uneven Ground
-
Deliveries - Moving Vehicles
-
Elictrical Live Cables
-
Lifting and Manual Handling Operations
-
Confined Spaces
-
Hazardous Substances
-
Hand-Arm Vibration
-
Loud Noise
-
Lone Working
-
Work-Related Violence
Stage 7: Hazard Identification . Identify the key task hazards and control measures that the RAMS do not suitably cover, particularly those not identified in Section 6.
Hazard 1 and Control Measure 1
-
Hazard 1
-
Control Measure 1
Hazard 2 and Control Measure 2
-
Hazard 2
-
Control Measure 2
Hazard 3 and Control Measure 3
-
Hazard 3
-
Control Measure 2
Stage 8: Risk Rating . Evaluate the risks
-
Low Risk
-
Medium Risk
-
High Risk
Stage 9: Declaration
-
I/we confirm that the contents of this Risk Assessment have been explained to me/us and I/we agree to abide by the control measures and inform the site supervisor immediately of any changes that may affect the health and safety of me/us or others likely to be affected by the works. We have the correct competencies, permits, equipment, and PPE to carry out the work safely.
-
Printed Name
-
Signature
-
Printed Name
-
Signature
-
Printed Name
-
Signature
-
IF CIRCUMSTANCES ON SITE CHANGE, WORKS MUST STOP AND THE RISKS MUST BE RE-ASSESSED
Approval
-
Date and time of approval
-
Approver's signature