Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Working at Heights
-
1.1. Fall risks (including voids, pits, and trenches)
-
1.2. Edge protection?
-
1.3. Incomplete edge protection?
2. Plant and Equipment
-
2.1. Unsafe or damaged plant/equipment? (including missing or damaged guards)
-
2.2. Plant /equipment ? (e.g. grinding discs for cutting)
-
2.3. Unsafe or incompatible attachments used with plant/equipment?
-
2.4. Safe work instructions and procedures?
-
2.5. Training in safe operation, clean-up and maintenance?
-
2.6. Procedures for cleaning, servicing and maintenance?
-
2.7. Inspection regime?
3. Scaffolds
-
3.1. Trained persons erecting scaffolding?
-
3.2. Unsafe or incomplete scaffold?
-
3.3. Inspection protocol for scaffold? (Within 7 days)
-
3.4. Scaffold design drawings ?
-
3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)
4. Lifting Equipment
-
4.1. Unsafe or damaged plant?
-
4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?
-
4.3. Lack of maintenance, testing and inspection?
-
4.4. Lack of SWL information displayed?
-
4.5. Lack of daily inspection protocol?
-
4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?
-
4.7. Lifting equipment unlabelled, no SWL displayed?
-
4.8. Unlicensed operators?
-
4.9. Lack of procedures for cleaning, servicing and maintenance?
-
4.10. SWL of plant or any lifting equipment exceeded?
5. Harness and Equipment
-
5.1. Unsafe or damaged harness or equipment?
-
5.2. Incompatible equipment?
-
5.3. Unsafe or uncertified anchor points?
-
5.5. Inspection protocol for equipment?
-
5.6. Formal training for operators?
6. Ladders
-
6.1. Unsafe or damaged ladders?
-
6.2. Positioning of ladders? ( ratio 1:4 )
-
6.3. Ladder secured?
-
6.4. Ladder unsuitable for job? (e.g. metal ladder used for electrical work)
7. Hazardous Manual Handling Tasks
-
7.1. Identification of hazardous manual handling tasks?
-
7.2. Assessment of hazardous manual handling tasks?
-
7.3. Risk controls? (examples: lighter loads, mechanical aids etc)
-
7.4. Training in risk controls and safe lifting/ team lifting techniques?
8. Hazardous Materials (including fuel oil and asbestos)
-
8.1. Storage and location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)
-
8.2. Incompatible chemicals stored near each other?
-
8.3. Spill containment equipment?
-
8.4. COSHH assessments accessible on site?
-
8.5. Emergency procedures for injury/spills/fire etc?
-
8.6. Excessive quantities stored on site or in vehicles?
-
8.7. Suitable PPE ?
-
8.8. Asbestos surveys available ? ( Management / R&D )
-
8.9. Asbestos Management ? ( licensed / un-licensed )
9. Emergencies
-
9.1. Emergency plans for site?
-
9.2. Emergency procedures not displayed at site?
-
9.3. Training and rehearsal of emergency plans?
-
9.4. Suitable equipment for dealing with an emergency ? ( fire extinguishers, specialist first aid equipment etc )
-
9.4. First aid kits aid equipment for site?
-
9.5. Number of formally trained First Aiders on site?
10. Traffic Management
-
10.1. Traffic Management Plan (TMP) in place?
-
10.2. Training in TMP for all persons on site? <br>(contractors and visitors)
-
10.3. Controls for Traffic, vehicle movement ? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)
11. Personal Protective Equipment (PPE)
-
11.1. PPE
-
11.2. System to issue, inspect, replace and monitor PPE?
-
11.3. Training in safe use, clean-up and inspection of PPE?
12. Work Environment
-
12.1. Welfare and amenities? (toilets, wash areas, drying room etc)
-
12.2. Lighting ?
-
12.3. Housekeeping ?
-
12.4. Provision of noise/ vibration control?
13. Electrical Hazards
-
13.1. Unsafe electrical leads? (Damaged)
-
13.2. RCD protection?
-
13.3. Overloading outlets?
-
13.4. Leads placed on ground?
-
13.7. Electrical equipment near water?
-
13.10. Electrical leads that may be damaged from contact with moving machinery parts?
-
13.12. Lack of Lock off procedures for electrical equipment?
14. Environmental Hazards
-
14.1. Lack of/or inadequate Site Waste Management plan (SWMP)?
-
14.2. Lack of/or inadequate systems to prevent contaminants entering stormwater drains?
-
14.3. Waste removal / storage ? ( carriers license / transfer notes )
15. Administrative Procedures
-
15.1. Construction Phase Health and Safety Plan?
-
15.2. Induction for workers, contractors, visitors?
-
15.3. Supervisory arrangements?
-
15.4. Training, knowledge, skills, experience?
-
15.5. Risk Assessments / Method Statements. ?
-
15.6. Routine inspections, monitoring, audits?
-
15.7. F10, H&S poster, public liability etc displayed ?
Comments / other findings
-
Comments
Sign Off
-
On site representative
-
Auditor's signature