Title Page

  • Unit Number

  • Conducted on

  • Prepared By

  • Supervisor

  • Reinspection Date

1. Previous Safety Inspection Report

  • Have all previous issues been rectified

2. Public Safety

  • Are footpaths and public area’s free of building materials and any trip hazards or dangerous conditions to the public

  • Are access gates being opened in the correct direction and not blocking footpath and creating a hazard to the general public

  • Are site safety and danger signs adequate and in visible locations

3. Site Security

  • Are site signs in correct location and fully legible and visible

  • Are identified site specific hazards mentioned on the site sign eg: overhead power lines, gas lines, open trenches etc (has it been updated)

  • Is each unit numbered on front & rear elevations

  • Is temporary fencing installed correctly and being maintained

4. Electrical

  • Is builders power pole secure with correct bracing and in good condition

  • Has height clearance to power lines been listed on Site Specific Hazard Board at front entrance

  • Is electrical meter box safety switch RCD being tested and tagged at monthly intervals

  • Test Date of RCD Safety Switch

  • Contractors onsite have had there electrical equipment test & tagged and is in date

5.. Housekeeping & Hygiene

  • Is water meter installed & not leaking

  • Is tap upstand installed at water meter

  • Is builders toilet clean and being serviced at regular monthly intervals

  • Date of last toilet service

  • Does site rubbish skip or cage require emptying

  • Is the site clear of material off cuts and rubbish generated by contractors ( Placed in skip bins)

6. Fall Zone Protection

  • Have all impalement hazards been capped off or removed (Star Pickets, Set Out Hurdles etc)

  • Are all openings correctly barricade off from which a person or object could fall 2m or more, ( Balconies, Window & Door Openings etc)

  • Has the correct compliant stair void platform & ladder been installed

  • Has perimeter guardrail been provided for upper storey possi joist, flooring & wall installation

Basement

  • Has the correct lighting been provided

  • Is drainage system working correctly & stopping basement from flooding

7. Additional Issues

  • Are there any additional safety issues with the site

  • Comments

  • Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.