1.0 DOCUMENTS
-
1.1 Is the safety management plan for this project or Project WHS Management Plan available on site.<br>Regulation 309
-
Comment and actons:
-
1.2 Are there Safe Work Method Statements on site for all high risk construction work?<br>Regulations 291,299
-
Comment and actions:
-
1.3 have The management plan & safe work method statements been reviewed/signed off.<br>Regulations 302 & 311
-
Comment & Actions:
-
1.4 Is an emergency/serious accident procedure displayed on site? Do site workers understand the procedure?<br>Regulation 43
-
Comments & Actions:
-
1.5 Is there a accident/injury register on site
-
Comments & actions:
-
1.6 If an accident/incident has occurred was the Departmental representative informed and has an incident report been completed?<br>Procedure after an incident OPP-2101
-
Comments & actions:
-
1.7 Is the Construction Environmental Management Plan on site?
-
Comments & actions
-
1.8 Are there certificates of currency on site for Workers Compensation Insurance (or Personal Accident Insurance)?
-
Comments & actions:
2.0 INDUCTION AND TRAINING; HOUSEKEEPING; ACCESS AND EGRESS
-
2.1 Are there records of site inductions and training on site?<br>Regulation 316,317
-
Comments & action:
-
2.2 Have prohibited employment declarations been completed and included on induction register for all schools, TAFEs or other sites where children or vulnerable people are present?
-
Comments & actions:
-
2.3 Are there any persons on site that have not had an induction<br>Regulation 316
-
Comments & actions:
-
2.4 Is the site tidy with storage areas for materials and accessible and well maintained waste bins?
-
Comments & actions:
-
2.5 Is there access and egress, including emergency exits and clear passage to emergency assembly area?
3.0 CONSULTATION
-
3.1 What consultation process is in place with employees?<br>WHS Act Part 5: Act 47
-
- Safety committee
- Safety representative
- Toolbox talks
- Other agreed arrangements
4.0 IDENTIFYING SERVICES Reg 304 Work near underground assets guide 2007
-
4.1 Has dial before you dig (1100) been contacted
-
Comment & actions
-
4.2 Have asset owners "AS BUILT" drawings been consulted.
-
Comment & actions
-
4.3 Has a services locator been engaged to locate services?
-
Comment & actions
-
4.4 Are located services clearly identified on site?
-
Comment & actions
-
4.5 Have located services been documented on drawings?
-
Comment & actions
-
4.6 Have identified services been isolated?
-
Comment & actions
-
4.7 Is potholing/hand digging used to locate services?
-
Comment & actions
-
4.8 Is a safety observer/spotter used when excavating around underground services?
-
Comment & actions
5. WORK NEAR OVERHEAD POWER LINES WHS Reg Part 4.7. work near overhead power lines Code of Practice
-
5.1 Has network operator been consulted regarding work
-
5.2 Has the supply been de-energised
-
Comments & actions
-
5.3 Has the location and voltage of the overhead power lines been determines
-
Are persons aware of approach distances (ordinary person)
-
Are persons aware of approach distances-Accredited Person
-
5.4 Are spotters being used when plant is operating near overhead power lines
-
Comments & actions
-
5.6 Is warning signage for overhead power lines located In The cab of the item of plant being used
-
Comments & actions
6. WORK NEAR PUBLIC PLACES
-
6.1 Is the site securely fenced<br>Regs 298
-
Comments & actions
-
6.2 Is the name & contact telephone numbers including an after hours emergency number of the principal contractor displayed!<br>Regs 308
-
Comments & actions
-
Add media
-
6.3 Is appropriate construction and PPE signage displayed?<br>AS1319-Safety signs for occupied environments
-
Comments & actions
-
Add media
7. AMENITIES
-
7.1 1 toilet per 20 workers?<br>Reg 40,41
-
Comments & actions
-
7.2 Are there washing facilites?
-
Comments & actions
-
7.3 Adequate fresh, cool drinking water?
-
Comments & actions
-
7.4 Are clean lunch and change rooms provided?
-
Comments & actions
-
7.5 Are rubbish bins provided?<br>Codes of practice-amenities for construction work & work place amenities
-
Comments & actions
-
Add media
8. FIRST AID
-
8.1 Is there a register of injuries and first aid treatment?<br>First aid in the workplace guide
-
Comments & actions
-
8.2 Is a fully stocked first aid box on site?<br>Regs 42; first aid in the workplace guide 2001
-
Comments & actions
-
8.3 Is there a qualified first aid person on site<br>Regs 42
-
Comments & actions
9. ELECTRICAL WHS regs Part 4.7
-
9.1 Are all power supply outlets protected by earth leakage/RCD devices?<br>AS/NZ3012:2010, reg 164,165
-
Comments & actions
-
Add media
-
9.2 Is there a lockable or non conductive material cover over circuit breakers & RCDs associated with outgoing circuits but which does not prevent access to isolating switches?
-
Comments & actions
-
Add media
-
9.3 Do the machines/tools on site have guards fitted?
-
Comments & actions
-
Add media
-
9.4 Are the leads and plugs in good condition?
-
Comments & actions
-
Add media
-
9.5 Are double adapters being used?
-
Comments & actions
-
Add media
-
9.6 Are the extension leads elevated and not extended more than 5m without support?
-
Comments & actions
-
Add media
-
9.7 Are plugs in wet areas?
-
Comments & actions
-
Add media
-
9.8 Are extension leads no more than 30m in length?
-
Comments & actions
-
9.10 Is there any electrical equipment overdue foe inspection!.
-
Comments & actions
-
9.11 Is there a record of inspections?<br>Regs 150, AS/NZ3012:2010
-
Comments & actions
10. WORKING AT HEIGHTS WHS Regs Part 4.4
-
10.1 Is safety mesh being used & certificate provided?
-
Comments & actions
-
Add media
-
10.2 Are gloves being worn?
-
Comments & actions
-
10.3 Is there safe access to roof area?
-
Comments & actions
-
10.4 Prevention of falls if work area is above 2m and within 2m of the edge are guard rails or scaffolding or harness being used?<br>Regs 299,303 (SWMS required) CoP Managing the risk of falls I. Workplaces
-
Comments & actions
-
Add media
-
10.5 Are tools secured by lanyards?
-
Comments & actions
-
10.6 Are floor and roof penetrations covered?
-
Comments & actions
-
Add media
-
10.7 Are the ladders extended at least 1m above the top of the work platform?<br>CoP Managing the risk of falls at workplaces
-
Comments & actions
-
Add media
-
10.8 Are the ladders at least 4.6m fro. Live conductors?
-
Comments & actions
-
10.9 Are only timber or fibreglass ladders used for work near electrical equipment?
-
Comments & actions
-
Add media
-
10.10 Are ladders in good order - No damaged stiles or rungs, rubber buffers on feet?
-
Comments & actions
11 SCAFFOLDING -STATIC
-
11.1 Are the scaffolds secured against tipping (bracing in all directions tied to bulking every 3.6m)<br>coP Managing risk of falls at workplaces Reg 225
-
Comments & actions
-
Add media
-
11.2 Are handrails, mid rails and toe boards in place along the fill length of the scaffold (platforms over 2.0m in height)
-
Comments & actions
-
Add media
-
11.3 Are the planks secure - platforms fully decked?
-
Comments & actions
-
Add media
-
11.4 Is proper ladder access provided to the scaffold working decks? (Fixed top & 1:4 slope)AS4576: clause 89
-
Comments & actions
-
Add media
-
11.5 Has the risk of falling objects on the external face of the scaffold been prevented?
-
Comment & actions
-
11.6 Has the risk of falling objects on the internal face of the scaffold been prevented?
-
Comment & actions
-
11.7 If the scaffold is under erection, has a safety barrier been set up near the scaffolding base, is signage used?<br>AS 4576
-
Comments & actions
-
Add media
-
11.8 Are there so,I'd foundations under scaffolding?
-
Comment & actions
-
11.9 Are there base plates and sole plates for the standards?
-
Comments & actions
-
Add media
-
11.10 Has a sign off for licensed scaffolder been received for scaffolding of 4m or more in height confirming compliance with AS1576?<br>Reg 225, AS4576 Scaffolding
-
Comments & actions
-
Add media
12. MOBILE SCAFFOLDS
-
12.1 Do mobile scaffolds have lockable wheels
-
Comments & actions
-
Add media
-
12.2 Are the wheels locked
-
Comments & actions
-
12.3 Is safe internal ladder access available?
-
Comments & actions
-
Add media
-
12.4 Are handrails, mid rails and toe boards in place along the full length of the scaffold? (Platforms over 2.0m in height)
-
Comments & actions
-
Add media
-
12.5 Is the height less than 3 times the width of the base?
-
Comments & actions
-
12.6 Do outriggers have to be used?
-
Comments & actions
-
12.7 Have overhead electrical hazards been considered?<br>AS 4576 clause 5.4
-
Comments & actions
13 FORMWORK
-
13.1 Are exposed ends of concrete reinforcing protected? <br>Code of Practice - Formwork
-
Comments & actions
-
Add media
-
13.2 Are floor and roof penetrations covered?<br>Code of Practice -formwork
-
Comments & actions
-
Add media
-
13.3 Has the formwork been inspected by an independent qualified engineer?<br>Formwork CoP - prelims clause independent certification of formwork
-
Comments & actions
-
Add media
-
13.4 Is there edge protection eg handrails on decks above 2m?<br>Reg 78,79
-
Comments & actions
-
13.5 Are all temporary work platforms at least 450mm (2 planks) wide?
-
Comments & actions
-
Add media
-
13.6 Are timbers de-nailed as it is removed?
-
Comments & actions
-
13.7 Are barriers/signs erected to warn others that formwork erection/stripping are taking place
-
Comments & actions
-
Add media
14 PLANT AND EQUIPMENT WHS regs chapter 5
-
14.1 Is there a register of plant and equipment on site?
-
Comments & actions
-
14.2 Do plant operators have appropriate licenses, are copies retained on Site?<br>Part 4.5 high risk works division 1 license<br>Nosing of high risk work, Regs 3&4 fact sheet load shifting machines.
-
Comments & actions
-
14.3 All machinery has registration/permits?<br>Regs 227
-
Comments & actions
-
14.4 Are the safety check log books for machinery completed and signed?
-
Comments & actions
-
14.5 Do backhoes/excavators have "beware of electrical hazards" signs?
-
Comments & actions
-
Add media
-
14.6 Is the work close to power lines & are workers aware of regulations?<br>AS 2550.1 cranes safe use general requirements
-
Comments & actions
-
14.7 Is plant in good order? (Visual inspection - no oil leaks - hydraulic hoses OK)
-
Comments & actions
-
14.8 Is the safe working load (SWL) indicated on the boom of all cranes?<br>Regs 219
-
Comments & actions
-
Add media
-
14.9 Do vehicles/earth moving plant have reverse alarms and rotating orange lights where necessary?<br>Regs 215, CoP moving plant on construction sites
-
Comments & actions
-
14.10 Are site workers wearing high visibility vests?
-
Comments & actions
-
Add media
-
14.11 re operators of elevated work platforms (EWP) that exceed 11m ticketed. Part 4.5 high risk works division 1 licensing of high risk work, regs schedule 3&4, fact sheer load shifting machines.
-
Comments & actions
-
14.12 Has training been provided to operators of all EWP?
-
Comments & actions
15 CONFINED SPACES WHS regs part 4.3 SWMS required
-
15.1 Any work in confined space? <br>Reg part 4.3 confined spaces
-
Comments & actions
-
15.2 Are crews trained and equipped for confined space work?
-
Comments & actions
-
15.3 Is there a confined space permit signed off for the work?
-
Comments & actions
-
15.4 Are rescue, first aid and emergency arrangements in place eg tripod over hole, harnesses are being worn?
-
Comments & actions
-
Add media
-
15.5 No equipment capable of generating noxious gas in the work area (generators, etc)?
-
Comments & actions
-
15.6 Is there suitable ventilation of the confined space?
-
Comments & actions
-
15.7 Are barricades and signs erected?
-
Comments & actions
-
Add media
-
15.8 Are confined spaces secured after work is completed?
-
Comments & actions
16 WORK NEAR or OVER WATER SWMS required
-
16.1 Are there safe work plat forms over water?
-
Comments & actions
-
Add media
-
16.2 Is there adequate safety line/fall arrest system in place?
-
Comments & actions
-
16.3 Is there an adequate safety line eg life buoy, life lines, safety boats?
-
Comments & actions
17 DEMOLITION
-
17.1 Have gas, electricity and other services been located disconnected and verified by sign offs by competent persons?
-
17.2 Is a licensed demolition contractor being used?
-
Comments & actions
18 EXCAVATION
-
18.1 Are barricades/fences/signage along/around trenches and work areas<br>Regs Division 3 excavation work
-
Comments & actions
-
Add media
-
18.2 Are excavations correctly shored, benched or battered? (More then 1.5m in depth) and access ladders provided?<br>Regs 306: excavation code of practice
-
Comments & actions
-
Add media
-
18.3 Are materials placed or stacked within 1m of the edge of the excavation?<br>Excavation code of Preactice
-
Comments & actions
-
Add media
-
18.4 Have existing services been verified (dial before you dig), have existing services been de-energised (electrical, gas, etc)?<br>Reg 304
-
Comments & actions
19 ASBESTOS REMOVAL
-
19.1 Has asbestos been identified within the work site?
-
Comments & actions
-
19.2 Is there and asbestos register on site?<br>Regs 425
-
Comments & actions
-
19.3 Have warning signs or labels been affixed to areas asbestos is located on site?
-
Comments & actions
-
Add media
-
19.4 Is a licensed asbestos removal isn't engaged to carry out the work?<br>Rags 458
-
Comments & actions
20 MANUAL/MATERIALS HANDLING
-
20.1 Are areas where loading and unloading occurs secured to prevent unauthorised entry whilst task is auctioned?
-
Comments & actions
-
Add media
-
20.1 Have all personnel been trained in safe manual handling processes?
-
Comments & actions
-
20.3 Are all operators of plant engaged in loading/unloading licensed?
-
Comments & actions
21 PERSONAL PROTECTIVE EQUIPMENT
-
21.1 Are site safety rules displayed around the site?
-
Comments & actions
-
Add media
-
21.2 Are safety helmets being worn by all?<br>Regs chapter 3 part 3.1 & 3.2, including Reg 44, 45
-
Comments & actions
-
Add media
-
21.3 Are safety boots being worn?<br>Regs clause 44,45
-
Comments & actions
-
Add media
-
21.4 Are workers wearing hearing protection whilst doing/ or working near noisy work?<br>Regs 44,45, Regs part 4.1 noise
-
Comments & actions
-
Add media
-
21.5 Are warning signs displayed?
-
Comments & actions
-
Add media
-
21.6 When working in dusty conditions, are masks being worn and was the dust suppressed?
-
Comments & actions
-
Add media
-
21.7 Are workers exposed to ultra violet rays adequately protected:
-
Comments & actions
22 HOT WORK
-
22.1 Are suitable fire extinguishers on site?
-
Comments & actions
-
Add media
-
22.2 Are barricades or screens and warning signs used in areas where work is being done?
-
Comments & actions
-
Add media
23 ENVIRONMENTAL MANAGEMENT
-
23.1 Is this site in a sensitive area?<br>Eg heritage, heavily vegetated contaminated, creeks or water ways, if so seek advice from Environmental Representative.
-
Comments & actions
-
23.2 Is there documentary evidence of compliance with any previously issued comments and actions?
-
Comments & actions
-
23.3 Are there any obvious sings of construction related disturbance out side the construction zone?
-
Comments & actions
-
Add media
-
23.4 Is there a copy of signed off environmental management plan on site?
-
Comments & actions
-
24.5 Have required erosion control measures been correctly installed nd are hey functional?<br><br>Check that there are/is:
-
Comments & actions
-
23.6 Is there a spill kit readily accessible?
-
Comments & actions
-
23.7 Is dust suppression equipment readily available eg water cart or hose?
-
Comments & actions
-
Add media
-
23.8 Are there any obvious signs of dust deposition outside of construction areas?
-
Comments & actions
-
Add media
-
23.9 Is spoil being prevented from being tracked onto public roads (eg rattle Gris, wash down area).
-
Comments & actions
-
23.10 Do trucks removing spoil from site have their loads covered?
-
Comments & actions
-
Add media
-
23.11 Archaeology/heritage - Are protection measures in place and functional? (If applicable)
-
Comments & actions
-
23.12 Are any construction vehicles obstructing the passage of local traffic (including pedestrians)
-
Comments & actions
-
Add media
-
23.13 Is the complaints register complete and have actions detailed been implemented?
-
Comments & actions
-
23.14 Are all required vegetation protection measures in place and functional? (Eg parra web fencing, tree guards)
-
Comments & actions
-
Add media
-
23.15 Any other issues if so seek advice from Environmental Representative?
-
Comments & actions
24 HAZARDOUS CHEMICALS/SUBSTANCES WHS regs chapter 7
-
24.1 Documentation?
-
Comments & actions
-
24.2 Labelling<br>Are containers of chemicals adequately labelled (including decanted ones)?<br>Regs 357,360
-
Comments & actions
-
24.3 Training<br>Have site workers been trained in how to use the chemicals/spill kits safely?<br>Regs 357,360
-
Comments & actions
-
Comments & actions
-
24.4 Srorage<br>Are chemicals segregated and stored appropriately?
-
Comments & actions
-
Add media
-
24.5 Ventilation - Is adequate ventilation provided when chemicals are stored or in use?
-
Comments & actions
25 WORKCOVER, DEC (EPA) or Local Authority Visits
-
25.1 Have any WorkCover, DEC (EPA) or local Authority representatives attended the site since the last meeting?<br>If yes when did they attend?
-
Comments & actions
-
25.2 were there any Prohibition and Improvement Notices (PINs) issued?
-
Comments & actions
-
25.3 were there any on the spot fines issued to the contractor and/or sub-contractor and/or employee?
-
Comments & actions
26 QUALITY MANAGEMENT
-
26.1 Is there a copy of the signed off Project Quality Management Plan on site?
-
Comments & actions
-
26.2 Is there a corrective action request (CAR) register in use on site?
-
Comments & actions
-
26.3 Is there any evidence of a representative of the Principal of the Contract signing off a witness on the contractors ITPs?
-
Comments & actions
-
26.4 Are there any hold points on the contractor's ITPs that have not been endorsed by the Principal or the Principals Authorised Representative?
-
Comments & actions
-
26.5 Are sub contractors using the latest drawings according to the Drawing Register?
-
Comments & actions
27 OVERALL COMMENTS
-
27.1 What is the best area of safety management and what needs most improvement?
-
Comments & actions
-
27.2 General comments about this site (including follow up action recommended)?
-
Comments & actions
SIGN OFF
-
Principals Authorised Person
-
Select date
-
Contractor site manager
-
Select date