Title Page
-
Contract Name
-
Conducted on
-
Location
-
Weather
-
Inspection carried out by
-
Confirmation of the duty holders Principle Contractor (PC)
-
Confirmation of Principle Designer (PD)
Onsite Project Safety Checklist
Site Access and Egress + Traffic Management
-
Are all routes of access and egress safe and clear to and from the site?
-
Are all the approach signs on the public road in line with current regulations?
-
Is there a Traffic Management Plan (TMP) in place?
-
Are all the warning / directional signs in place as per the TMP?
-
Has site specific sections of the TMP been briefed to relevant parties?
-
Is the site appropriately secured off?
-
Is there any additional site security required (e.g Gate Person / CCTV Pods / Cameras)
-
Is face recognition in place at the site entrance to sign in?
Welfare Facilities
-
Are there adequate welfare facilities for workers including toilets, hand washing facilities, rest areas, and drinking water?
-
Is there segregated toilets in place (male / female)?
-
Are sanitary bins available in male & female toilets?
-
Are there means of heating up food?
-
Is there hot running water onsite, with soap for washing hands and dishes?
-
Has a drying room been provided which is sufficient for current and predicted project team?
-
Confirm that all the welfare facilities are cleaned and maintained on a regular basis?
-
Is there external smoking / vaping facilities in place.
-
Is there "No smoking" + "No Vaping" signs in place within the footprint of the welfare units?
-
Is the office environment sufficiently been set up, in line with DSE Guidelines? Correct Desks / Chairs / Screens etc.
-
Confirm drinking / bottled water + dispensers are in place for all to use.
-
Is servicing & cleaning in place for the water dispensers?
Site Setup
-
Is there informational signage in place?
-
Is there directional signage to get to the main compound?
-
Is there enough parking facilities for the current and expected project team?
-
Is there a Muster Point displayed?
-
Is there a safe section for site staff to park
-
Contractors compound in place for parking plant and store materials
-
Confirm segregation for pedestrians around the compound area?
Visible Safety Information
-
Has notice been given to the Health and Safety Excecutive Northern Ireland (HSENI)
-
NI10 (Northern Ireland) document displayed at the site entrance and within the main compound?
-
Is the Woodvale / Lowry JV company insurance document displayed?
-
Are the insurances displayed in date and cover the works activities?
-
Is the HSENI poster “Health and Safety the Law and You” or Health and Safety ‘What you need to know’ on display in the site office and completed?
-
Is a sign in/out procedure in place and in use?
-
Is the address and contact number for the nearest Hospital on display in the site office?
-
Is the First Aider poster displayed?
-
Is the Fire Marshall posters displayed?
-
Are current relevant safety Critical Information available and on display in the Site Offices (Top 5 Risks)?
-
Are the current relevant Environmental risks displayed onsite (Top 5 Risks)?
-
Is the White Board in place, with a site drawing and all information current and relevant?
-
Site management "Who are we" (Hierarchy Chart) displayed - with photographs of head shots?
-
Is the Job Specific Safety Plan / Daily Risk Assessment in place and in view for all to read, understand and sign off?
-
Are the "Site Rules" in place and specific to the site and its current set up?
-
Are all project contact numbers on display - Emergency Contact Numbers?
-
Are the Company Policies displayed, in-date and signed off - not older than 12 months?
-
Are "What3Words" displayed at the site entrance and in the main compound?
Construction Safety Documentation
-
Is pre construction information available?
-
Is a Construction Phase Plan (CPP) available?
-
Is there a Construction Environmental Plan (CEMP) in place?
-
Is there a Traffic Management Plan available?
-
Is there a Fire / Emergency Plan in place?
-
Is there a procedure in place for RAMS review?
-
Have these been reviewed by the project team?
-
Is there a Site Safety Induction in place?
Onsite Procedures
-
Confirm that the sites "Sign in/out" is in place and effective?
-
Following the completion of the Site Induction, is there a system in place where site team members are briefed on the site setup / JSSP / RAMS / Site Rules etc
-
Confirm a member of the site team, who is currently working on the site has been inducted and has the correct training cards for the task.
-
Confirm RAMS have been communicated to the team on the ground and evidence of signatures from the team?
-
Confirm the Daily Briefing has been communicated to the team on the ground and evidence of signatures from the team?
-
Are there TBT scheduled weekly?
-
Is the "Good Catch" Incentive scheme in place
-
Has a poster been displayed to communicate to others?
Competences and Training
-
Has induction training been received by everybody working on site?
-
Are training records available for all staff on site?
-
Have the RAMS / Lift Plans and any other documents submitted by the subcontractor been reviewed by the Site Management team / SHEQ?
Safety Monitoring
-
Is there an inspection and audit schedule in place? (SHEQ weekly / Site Manager weekly / PM monthly)
-
Has the SHEQ Advisor for each works package confirmed an audit schedule? (Woodvale / Lowry)
-
Has the Site Manager completed weekly site safety inspections?
-
Has the Project Manager completed a monthly audit?
-
Has a joint audit between JV SHEQ and Project Management team been scheduled?
-
Has a joint audit between JV SHEQ Advisor and junior members of staff been scheduled?
-
How are the results of safety audits communicated to people on site?
-
Are safety audit follow up actions being implemented?
-
Is there a need for a duty chart - in order to assign duties?
Emergency Procedures
-
Is an adequate emergency plan in place?
-
Has this been communicated to the site team?
-
Are the "grab and go" and the back of the plan easily assessable by the site team?
-
Is the necessary First Aid Kit (FAK) onsite?
-
Is the First Aid equipment in-date?
-
Is there a eye wash station onsite?
-
Is there a burns kit onsite?
-
Is there an automated external defibrillator (AED) on site?
-
Is the AED serviceable and in-date?
-
Has the location of the AED(s) been communicated to the site team and included in the induction?
-
Is there a stretcher onsite?
-
Is there sufficient Fire Fighting Equipment onsite?
-
Are there smoke alarms suitable and sufficient onsite - (welfare units)?
-
Is there a weekly testing schedule in place and documented?
-
Are people available on site who are trained in First Aid?
-
Are adequate rescue and evacuation procedures in place on site?
-
Are people on site familiar with the emergency and rescue procedures?
-
Have any Woodvale / Lowry / JV emergency drills been carried out on site?
-
Are there any plans to carry out an Emergency Rescue Drill?
-
Has this been documented?
-
Accident & Incident Reporting
-
Are the site personnel aware of, and implementing, reporting requirements for accidents or dangerous occurrences?
-
Ensure that all onsite personnel are aware of the importance of reporting accidents and incidents, no matter how small.
-
Ensure all accidents are reported to the Site Management Team as soon as possible.
-
Are there any requirements to report to the Client within a time frame?
-
Is the site management team aware of this? (Example= 30mins after incident - Notify). <br>• Within 24hrs 5 Ws + H. <br>• Full report within 10 days.
Plant, Materials and Equipment
-
Is safety information, Material Safety Data Sheets (MSDS) available for the materials being used on site?
-
Are COSHH Assessments available for materials being used onsite?
-
Are dust suppression measures reviewed, and can it be deployed as and when required?
-
Is the plant onsite used accordance with statutory requirements?
-
Has all plant been certified safe via Thorough Examination (TEC), in-date 12months?
-
Has all lifting equipment been LOLER inspected within the last 6 months?
-
Are all Plant and Lifting accessories on the LOLER / PUWER (NI) register and inspected weekly?
-
Are all ladders / podiums inspected and checked weekly?
-
Are all excavations inspected at the start of each shift and recorded weekly?
-
Any working at Height (Scaffolding / Aluminium Towers ) structures being inspected at the start of each shift and recorded weekly?
-
Are Daily Plant Inspections being completed?
-
Are these being submitted at the end of each working week?
Communication and Interfaces
-
Are weekly Tool Box Talks being completed?
-
Are there sufficient time allowed for all workers to express or challenge safety information?
-
Has a Safety Rep been selected by the site team?