  • Project Name

  • Project location
  • Date & Time

Site Details

  • Weather

  • Site Conditions

  • Signature

Contractor Details

  • Contractor

  • Foreman/Site Manager on site

  • Personnel on site

  • Materials on site

  • AP40

  • GAP65

  • GAP40

  • 225 RCRRJ Pipes

  • 375 RCRRJ Pipe

  • Subcontractors on site

Site Visit Details

  • Work Completed Since Last Inspection

  • Work in Progress

  • Verbal & Written Instructions/Directions Issued to Contractor

  • Follow up Actions Required

Testing & Checking

Subsoil Drainage

  • Is under drainage in

  • Does Pavement need positive drainage/herring bones

  • Comments

Drainage

  • Drainage in correct position

  • Additional drainage required

  • Drainage

Kerb & Channel

  • Visual inspection kerb & channel needed

  • Is any additional kerb & channel

  • Comments

Metal/Basecourse/Subbase/Lower Subbase

  • Metal layer

  • Compaction and plant OK

  • Shape OK / Level & depth check

Sealing

  • Seal Type

  • Prepared surface visual inspection

  • Rolling of chip acceptable

  • Bitumen sample taken

Stabilisation

  • Pre-ripping depth checked

  • Make up metal thickness check

  • Cement/lime spread rate. State kg/m2 target rate

  • Pulverise thickness. State thickness

  • Compaction and plant OK

  • Comments

Pavement furniture

  • Pavement marking

  • RRPM installed

  • Signs/edge dellineators

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.