Title Page
-
Site conducted
-
Asset ID
-
Conducted on
-
Conducted By
-
Project equipment is to be used on:
-
For each piece of equipment please conduct the pre-start checklist, you will be asked for asset ID's for each one.
Equipment Type
-
Equipment Type
- Chainsaw
- Pole pruner
- Brushcutter
- Electric Drill
- Mower
- Auger
- Hedge Trimmer
-
Is this the electric or petrol operated tool?
- Electric
- Petrol
-
Battery charged?
-
Chain - is it sharpened and well-fitted?
-
Bar oil packed on ute?
-
Chainsaw tools - do you have your chainsaw file kit?
-
Chaps are packed on ute?
-
Helmets/visor/hearing protection packed?
-
Start tool to ensure operational
-
Top up 2 stroke in fuel tank
-
Top up oil chamber, ensure cap is on properly
-
2 stroke fuel and bar oil packed on ute
-
Check chain - is it sharp and fitted correctly?
-
Chaps are packed on ute?
-
Helmets/visor/hearing protection packed?
-
Chainsaw tools - do you have your chainsaw file kit?
-
Start the chainsaw
-
Is this the electric or petrol operated tool?
-
Battery charged?
-
Chain - is it sharpened and well-fitted?
-
Chainsaw tools - do you have your chainsaw file kit?
-
Chaps packed?
-
Helmets/visor ear protection packed?
-
Start tool to ensure operational
-
Top up 2 stroke in fuel tank
-
Top up oil chamber, ensure cap is on properly
-
2 stroke fuel and bar oil packed on ute
-
Check chain - is it sharp and fitted correctly?
-
Chaps are packed?
-
Helmets/visor/hearing protection packed?
-
Chainsaw tools - do you have your chainsaw file kit?
-
Start the chainsaw
-
Is this the electric or petrol operated tool?
-
Check bolts, fixtures and throttle cable, ensure no damage
-
Battery charged?
-
Select appropriate head fitting
-
Ensure blade is sharp and fitted correctly
-
Ensure cord is re-filled and spare cord packed
-
Relevant tools packed
-
Harness Packed
-
Start tool to ensure operational
-
Check bolts, fixtures and throttle cable, ensure no damage
-
Top up 2 stroke in fuel tank
-
Select appropriate head fitting
-
Ensure blade is sharp and fitted correctly
-
Ensure cord is re-filled and spare cord packed
-
2 stroke fuel packed
-
Harness is packed
-
Helmets/visor/hearing protection packed
-
Relevant tools packed
-
Start the brushcutter to ensure functioning properly prior to packing.
-
Asset ID
-
Battery charged?
-
Toolbox packed - with spare bit and spare battery
-
Check throttle cable for damage, check bolts / attachments for any loose parts
-
Unleaded fuel - top up tank
-
Check oil levels
-
Check blades
-
Ensure no seed material on machinery prior to loading
-
Start prior to loading
-
Attachment sharp enough and well -fitted?
-
Inspect handles and body for any cracks / damage. Check bolts, fixtures and throttle cable, ensure no damage
-
Fuel Packed?
-
Ear-muffs / hearing protection packed?
-
Pre-start equipment prior to leaving depot and ensure functioning correctly.