Title Page
-
Conducted on
-
Site
-
Conducted By
- Mario
- Roberto
- Leonard
- Andrew
- Luke
- Blake
- Jeramy
- Adam
- Anthony
- Julio
- Scoutt
- Brian
- Jared
- John
- Dalton
- Contractor
- Contractor
- Contractor
- Contractor
- Contractor
-
Are contractors on site and if yes please list names
-
Reason for Visit
- Maintenance
- Repair
- Inspection
- Oil Change
- CMS
- QC
- Reset
- EOW
- Major Component Replacement
-
Work Order Number
-
Work Start Time
-
Work Stop Time
Control House
-
Current MW output
-
Current MVAR
-
Current MVA
-
Heater/AC 1
-
Heater/AC 2
-
Anunciator - Alarm Test
-
Relays- record and report status lights with pictures
-
Safety Equipment- Fire Extinguishers, Safety Barriers, Locks, Warning Signs, Eye Wash Log Book<br>Take Pictures of defects
-
Battery Bank- Good Condition, Free of Debris, Water level Good,
-
Battery Voltage
-
Battery Charging Voltage
-
Overall Condition of control house-Take pictures of defects
Transformer/Station Service
-
Bushings, Tank, Leaks, Fuses, Terminations good? Document defects
Metering
-
PT A Condition
-
PT B Condition
-
PT C Condition
-
CT A Condition
-
CT B Condition
-
CT C Condition
Reactor Circuit
-
F2 RS 4 Breaker.<br>Condition of Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.
-
Breaker Open or Closed
-
Counter Reading
-
SF6 Pressure
-
52 RS 4 Switcher<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.
-
Open or Closed
-
Counter Reading
-
SF6 Pressure
-
Reactor #1<br>Check discoloration (heating); damage or defects.
-
Reactor #2<br>Check discoloration (heating); damage or defects.
-
Reactor #3<br>Check discoloration (heating); damage or defects.
-
Neutral CT Rl<br>Check for damage or defects
-
Stress Cones, Cable<br>Deformation, condition , needs cleaned, other defects
-
Bus-Work<br>Bolted connections, insulators, other.
Capacitor Circuit
-
52 cs - 13<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.
-
Open/Closed
-
Counter Reading
-
SF6 Pressure
-
52 CS- 14<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.
-
Open/Closed
-
Counter Reading
-
SF6 Pressure
-
52 CS- 15<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.
-
Open/Closed
-
Counter Reading
-
SF6 Pressure
-
52 CS- 16<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.
-
Open/Closed
-
Counter Reading
-
SF6 Pressure
-
Neutral CT<br>Check for damage or defects
-
Stress Cones, Cable<br>Deformation, condition, needs cleaned, other defect s
-
Bus-Work<br>Bolt ed connection s, insulators, other.
Circuit Breakers
-
s/ n 8767 52-F1<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.Disconnects, insulators, bu s work, terminations, damage or defects
-
Open/Closed
-
Counter Reading
-
Stress Cones, Cable<br>Deformation, condition, needs cleaned, other defects
-
s/ n 8771 52-F2<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.Disconnects, insulators, bu s work, terminations, damage or defects
-
Open/Closed
-
Counter Reading
-
Stress Cones, Cable<br>Deformation, condition, needs cleaned, other defects
-
s/ n 8770 52-F3<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.Disconnects, insulators, bu s work, terminations, damage or defects
-
Open/Closed
-
Counter Reading
-
Stress Cones, Cable<br>Deformation, condition, needs cleaned, other defects
-
s/ n 8769 52-F4<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.Disconnects, insulators, bu s work, terminations, damage or defects
-
Open/Closed
-
Counter Reading
-
Stress Cones, Cable<br>Deformation, condition, needs cleaned, other defects
-
s/ n 8769 52-F4<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.Disconnects, insulators, bu s work, terminations, damage or defects
-
Open/Closed
-
Counter Reading
-
Stress Cones, Cable<br>Deformation, condition, needs cleaned, other defects
-
s/n 8766 52-F5<br>Bushings, housing, cabinet heaters, cabinet moisture, air vents, and others.Disconnects, insulators, bu s work, terminations, damage or defects
-
Open/Closed
-
Counter Reading
-
Stress Cones, Cable<br>Deformation, condition, needs cleaned, other defects
Switches and Disconnects
-
230 kv disconnect<br>Contacts properly engage d, control linkage, insulators.
-
Open/Closed
-
34.5 kv disconnect<br>Contacts properly engaged, control linkage, insulators.
-
Open/Closed
-
Buses, HV wiring<br>Bolted connections, insulators, other .
Transformer
-
Bushings
-
Cooling Fans Operational
-
Annunciator Alarms, Check alarms note and clear active alarms
Transformer Operating temps
-
Oil Temp
Winding Temp :
Winding XV
Max Temps
-
Oil Temp
Winding Temp :
Winding XV
-
Transformer Reactor<br>Check discoloration (heating); damage / Disconnects latched ; defects.
-
Neutral CT Rl<br>Check for damage note the tap position and oil level
Substation Yard
-
Fences, perimeter<br>Damage, attempted intrusion, 3rd party metallic fence attachments signs
-
Grounds<br>Equipment and fence grounds condition
Turbine Overview
-
Additional Notes and Pictures