Information

  • Document No.

  • POKAYOKE CHECK SHEET

  • TOYOTA MOTOR MANUFACTURING MISSISSIPPI

  • Conducted on

  • Prepared by

  • Personnel

  • GROUP:

  • QCPS#:

  • PROCESS:

  • CHECKED BY:

  • Select date

  • PSET

  • START

  • 1st TARGET

  • LOW

  • TARGET

  • HIGH

TOOL CAPABILITY

  • PSI (at regulator) -

  • COMMENT:

  • RANK A / ¥ Cpk => 2.0 or 1.3 (Rank B Cpk => 1.0)

  • COMMENT:

  • Tool in use matches QCPS

  • COMMENT:

  • Tool shuts off when torque is achieved ( hold trigger until green)

  • COMMENT:

  • Back up tool matches QCPS

  • COMMENT:

  • Controller dynamic value => target or cut

  • COMMENT:

  • Reverse disabled

  • COMMENT:

  • Target tool settings match Dynamic Torque

  • COMMENT:

  • MIN =. +1 = Target or Cut : MAX :

  • COMMENT:

  • Parameter Set Up Sheet & Tool Change Record (b)

  • COMMENT:

  • Angle MAX : $ MIN : Settings

  • COMMENT:

AVI / PNC

  • PI box labeled with correct node address & tool ID

  • COMMENT:

  • POKAYOKE operates correctly under normal conditions ( Stack light turns green with correct # of individual OK)

  • COMMENT:

  • PSET running matches POKAYOKE program for katashiki

  • COMMENT:

  • Resets after crossing L-10 or when next part is present (Green stack light goes off, Orange turns on)

  • COMMENT:

  • ANDON comes on correctly (approx. 70% yellow & red at line stop)

  • COMMENT:

ANDON/FAULTS (N=2) - (Use Back page for multiple programs)

  • Low torque - turns red beacon & stops line at end of pitch.

  • COMMENT

  • Low torque-turns on red beacon & stops line at end of pitch.

  • COMMENT:

  • Incorrect number turns on red light at judge point & stops line.

  • COMMENT:

  • Incorrect number turns on red light at judge point & stops line.

  • COMMENT:

  • Correct number of QLLS clicks release line.

  • COMMENT:

  • Correct number of QLLS clicks releases line.

  • COMMENT:

  • Tool does not pass on a REHIT.

  • COMMENT:

  • Tool does not pass on a REHIT.

  • COMMENT:

PROCESS SETUP

  • QLLS Registers in QIS as NGO - all items backup comp

  • COMMENT:

  • QLLS registers as a defect in CIS (list defect name)

  • COMMENT:

  • Next process cannot be started until next car crosses L-10 or next part is placed on/in sub assembly process.

  • COMMENT:

  • Tool / QLLS /QLLS cannot go outside L-10

  • COMMENT:

  • No part / wrong part selection ( interlock confirmation)

  • COMMENT:

BYPASS KEY SWITCH

  • Bypass key not present in switch ( only in possession of GL

  • COMMENT:

  • Red beacon comes on and registers in CIS as POKAYOKE Bypass when INTERLOCK OFF (back key)

  • COMMENT:

  • When forced complete?

  • COMMENT:

GREEN BEACON

  • Light goes solid green when process judgement is OK

  • COMMENT:

TRUTH TABLE CONFIRMED

  • All models programmed

  • COMMENT:

  • Model Year Updated

  • COMMENT:

DOCUMENTATION CONFIRMATION

  • DELTA C CONTROL CHART & notebook, MIS & QCPS revised (a)

  • COMMENT:

  • QLLS/QL setting confirmed (daily click wrench check sheet) (c)

  • COMMENT:

  • Abnormality check (pokayoke abnormality check repair log ) (d)

  • COMMENT:

SIGNATURES

  • Responsible Engineer

  • TEMA Representative

  • Production Representative

  • Responsible Engineer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.