Title Page
-
Conducted on
-
Prepared by
-
Location
Final Snagging Inspection
-
Concrete slab level and true
-
Floor Finish
-
Edges of Concrete Tidy
-
Polythene Cut Back
-
Shuttering removed
-
Square & Level Building
-
Rails Straight & Level
-
Purlins & Sleeves Fitted Correctly
-
Bolts in Place & Torque
-
Bolts in Correct Direction
-
Roof Sheets Straight & True
-
Ridge Fitted Correctly
-
Yorkshire Board Spacing
-
Yorkshire Board Levels
-
Box Profile Condition
-
Box Profile Levels
-
Box Profile Tech Lines & Spacing
-
Box Profile Stitcher Fitted
-
Box Profile Stitcher Lines
-
Fragile Roof Signs
-
MRE Signs
-
Barge Fitted Correctly
-
Flashings Fitted Correctly & Level
-
Gutter Fitted Correctly
-
Downpipes Fitted Correctly
-
Steelwork Clean & Painted
-
Site Tidy
-
Concrete Panels
-
Handover Meeting with Client
-
Completed Red Folder Returned to Office