Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Signature
Safety Checklist
-
Has access been provided to each working floor?
-
Is proper housekeeping being maintained by Southland, General Contractor, or other trades?
-
Has the new decking been properly secured to the floor?
-
Are the guardrails installed completely around the perimeter of the building?
-
Are all floor holes larger than 2 inches properly covered?
-
Is the deck above the working floor completely covered?
-
Are shaft openings properly protected?
-
Is adequate (natural or supplemental) illumination being provided?
-
Does any part of the deck need to be barricaded?
-
Is there any hazardous work (welding, etc.) taking place on the working floor?
-
Are there any sparks or other hazards falling through the floor from above?
Tasks, Equipment & Tools (check all that apply)
Tasks / Activities
-
Layout
-
Inserting
-
Cutting or Drilling
Equipment
-
Ladders
-
Scissors-Lifts / Boom-Lifts
-
Scaffolding
Tools
-
Power Tools
-
HILTI Tools
-
Lasers - Trimble
Fall Hazards
-
Roof Top
-
Other Fall Hazards
Required Safety Precautions and Protective Equipment (check all that apply)
Safety Precuations
-
Fire Extinguisher
-
Supplemental Ventialtion
-
Hole Covers
-
Task Lighting
-
Material Handling Aids
-
Shade / Water (Heat Illness Prevention)
-
Other
Personal Protective Equipment
-
Goggles - Faceshield
-
Personal Fall Arrest System
-
Fire-Resistant Clothing / Gloves
-
Disposable Respirator
-
Hearing Protection
-
Other
Working on Decking
-
Review applicable JHAs before starting work (Inserting, Roof Work, etc.)
-
Gang boxes should be set on plywood and blocked to prevent movement/tipping while on the deck.
-
Trip hazards should be properly marked to the extent possible.
-
Extra caution must be used on the uneven deck, mesh, around the inserts and other trip hazards.
-
Don't run. Do not walk backwards. Avoid carrying items that block your view.
Signature of Safety Representative
-
Add signature