Title Page
-
Job no.
-
Conducted on
-
Date & Time
-
Is Customer available
-
Surveyed By
-
Insert Name
-
Customer signature
-
Surveyor Signature
PROPERTY DETAILS
-
Site Address
-
Occupant Name
-
Occupant Contact Number
-
Occupant Email Address
-
Main Electricity Provider
-
Building Type
- Detached
- Semi
- Terrace
- End terrace
- Bungalow
- other
-
Details
-
No. of storeys
SOLAR PV SURVEY
-
Image of Property (side of PV Array)
-
Roof Covering
-
Please specify
-
Image of Tile
-
Roof Condition External
-
Images of existing roof
-
Orientation
- SOUTH
- SOUTH WEST
- SOUTH EAST
- WEST
- EAST
- NORTH
-
Shading
-
Will Scaffold be required
-
Any site access issue
-
Is there a Loft Hatch?
-
Image of loft hatch
-
Images of loft space
-
Loft Ladders Installed?
-
Floor Boards in Loft?
-
Proposed inverter location
-
Image of Inverter Location
STRUCTURAL INFORMATION
-
Roof Structure External
- gable
- hip
- gambrel
- flat
- mansard
- sloping
- other
-
Please specify
-
Depth of Truss (mm)
-
Width of Truss (mm)
-
Width Between Truss's (mm)
-
Internal Roof Timbers
Image
-
Image of Internal Roof Structure
-
Image of current reading and meter
OBSTRUCTIONS
-
Are there any external obstructions?
-
Add Object
Obstruction
-
Enter details
-
Image of Obstruction
-
Flue Type?
-
Is the flue obstructing the scaffolding?
-
Image of Flue
-
GAS ENGINEER REQUIRED PRIOR TO WORKS COMMENCING - NO WORKS ARE TO BE CARRIED OUT UNLESS THE BOILER HAS BEEN ISOLATED
-
Does the flue run through the loft?
-
Image of Flue
-
GAS ENGINEER REQUIRED PRIOR TO WORKS COMMENCING - NO WORKS ARE TO BE CARRIED OUT UNLESS THE BOILER HAS BEEN ISOLATED
SCAFFOLDING/EASI DEC ACCESS
-
What is your preference for roof access?
-
Is the elevation free of obstruction?
-
Insert Image
-
Is there good access for Scaffolding
-
Please provide Image for Ease of Access
EXISTING AC SUPPLY CHARACTARISTICS
-
Utility Meter Serial Number
-
Image of Utility Meter
-
Incoming Supply
-
Consumer Unit Make
-
Consumer Unit Model
-
Insert Image of Distribution Board
-
Are there any other considerations?
-
Other Considerations
-
If solar pv do dynamic risk assessment
-
Does customer have dogs ? Can we ensure on the day of install dogs are in safe area
-
Any elderly kids or visually impaired must be made aware of work and in a safe area.
-
On site parking or Access Issues Please Note details
-
Ensure scaffold is tagged on day of use
-
Is ladder access to neighbouring property required, ensure we have permission and aware of work scope
-
PPE to be worn
- Gloves
- Bump cap
- Protective clothing
- Ear protection( when using tools)
- Dust mask
- Safety specs
- Ladder ties
- Harness
- Safety boots
-
Use of a ladder/step ladder.
-
Noise.
-
Vibration.
-
Manual Handing.
-
Hand Tools/Power Tools
-
Electricity/Generator
-
House keeping/site tidiness.
-
Working with with wet cement, concrete or mortar.
-
Overhead cables.
-
Reversing a vehicle.
-
Asbestos.
-
Use of a Mobile tower/Mewp/Stair platform
-
Lone Worker.
-
Members of Public
-
Any other potential obstructions
-
Does customer have any health conditions that may impact the job
-
Details of health condition
DECLARATION
-
I can confirm that this survey has been carried out in a detailed and accurate manner.
All information in this report is accurate and true. -
Surveyors Declaration