Title Page

  • Conducted on

  • Location

Current Electrical Conditions

  • Does the property have a current up to date service loop?

  • Please provide photo of service loop.

  • Please provide photo of electric meter.

  • What is the current earthing bonding arrangement?

  • Does the fuse board meet current regulations?

  • What phase does the property currently have?

  • Are they any other renewables currently installed?

New Installation

  • Are the panels being fitted on the main property building?

  • Is the roof pitched or flat?

  • What is the roof covering?

  • Will the panels be mount of in-roof?

  • What size system is going to be installed?

  • How many strings will the system have?

  • Will there be any significant shading on the panels?

  • How many optimisers are required?

  • Where will the inverter be located?

  • Where will the cut-off switch be located?

  • What is the distance between the consumer unit and proposed location of the inverter?

  • What is the estimated voltage drop?

  • Does the customer wish to have battery storage?

  • Will the system be on or off grid?

  • Will the installation result in non-compliance with Building Regulations?

  • Are they any additional preferences/ requirements by the customer?

  • Are any additional parts required for the install?

  • Is scaffolding required?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.