Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Property information
-
Property Surveyed (elevations x4)
-
Number of occupants
-
Number of bedrooms
-
Will any form of protected species be disturbed?
-
What species
-
Electrical box (including loop)
-
Electric Bill (inc MPAN)
-
Is the existing electrical installation in good condition?
-
Is the existing electrical Box RCD protected
-
Picture of property highlighted on google Maps
-
Unit Electricity Price
-
Annual Consumption
Planning considerations
-
Is the property Listed or Conservation?
-
Are there any current renewables installed on site?
-
Will the installation come under permitted development?
-
Are there any planning issues to consider?
-
Will the installation result in non-compliance with Building regulations?
-
Will the installation work result in non-compliance with the Building Regulations in relation to workmanship; materials; structural stability; fire safety; resistance to moisture; conservation of fuel and power and electrical safety?
-
Will the proposed installation result in non-compliance with the IET wiring regulations?
-
Will the proposed installation be compliant with any requirements stated by the Solar PV system component products manufacturers?
System considerations
-
Home all day/Home half day/Out all day
-
On-site or remote survey
-
Retrofit or New Build
-
Roof / In Roof / Wall or Ground Mounted
-
Domestic / Commercial
-
On / Off Grid
-
Proposed location of Inverter:
-
Proposed location of Generation Meter:
-
Proposed location of the DC Disconnect and AC isolator:
-
Do the proposed locations of the above meet with both the regulatory requirements and the customer's expectations?
Roof Assessment
-
General Roof condition
-
Type of roof
- Slate
- Tile
- Sheet Metal
- Pan tile / Concrete
- Fibre Cement
- Metal
-
Property in an exposed location
-
Inclination of roof from horizontal:
-
Roof slope length, ridge to eaves:
-
Lower width – gable to gable:
-
Upper width – if different:
-
Gutter height above ground:
-
Are there any obstacles that will cause shading issues? (Chimneys, windows etc.).
-
Is there a likelihood that significant overshading issues could occur in the future e.g. tree growth?
-
Rafters checked against MIS-3002 section 5.8.6
-
Pictures of Roof front & back and Apex
-
Scaffolding required
Electrical Requirements
-
Does property have electric space heating, electric hot water or electric vehicle charging loads?
-
Is property on a split tariff meter (e.g. Economy 7)?
-
Latest 12 month readings for day/on peak tariff (kWh)
-
Latest 12 month readings for night/off peak tariff (kWh)
-
Is microgeneration already installed?
-
Are 12 months electricity reading (kWh) prior to the installation of these loads available from bills?
-
Will permission from the DNO be required prior to installation?
-
G99
-
G98
-
What is the distance from the Consumer Unit to the proposed location of the inverter
-
What is the voltage drop
-
Is main earthing and bonding in place?
-
Single/Three phase
Additional information
-
Does the customer have any preferences on the make of panels?
-
Does the customer have any preference on the colour of panels?
-
Any other important installation notes
-
Customer interested in other products with CSG
-
DNO Statement: As the landowner would like to confirm that I give my consent for the following company to make an application for an electricity connection at the above address on my behalf: Carbon Saving Group Ltd - 09470826 Unit 9 , 32 Burrington Way, Plymouth, PL5 3FR Thomas Read - 0800 772 3572
- Yes
- No
-
Customer Signature
-
Customer happy to receive marketing material from CSG
-
Customer Signature
-
Customer happy for us to hold their details under DPA and GDPR
-
Customer signature
-
Survey completed