General
-
Please provide a photo of the front of store
-
Please provide evidence that the Safe Plan of Action has been completed
-
Please provide names of attendees
-
Is there a H&S file on site?
-
Is there an Asbestos Register on site?
-
Please provide further detail of Asbestos on site.
-
Is there a Petrol Filling Station on the site?
-
Please provide photo of Petrol Filling Station.
Main Roof Survey
-
What is the building height?
-
Is there permanent access to the roof?
-
Please provide photo?
-
Is it internal or external?
-
Are the parapet heights above 950mm all around the building?
-
Please mark locations of edge protection required on the project on an additional drawing.
-
Is there a fall arrest system on the roof?
-
Is it certified and in date?
-
Please confirm roof pitch.
-
Please provide Dimensional Survey of the roof complete with measurements of all plant?
-
Is there evidence of Hazardous Materials being expelled from any plant on the roof?
-
Please provide photos.
-
Is there evidence of bird soiling on the roof?
-
Please provide photos.
-
Is there lightning protection on the roof?
-
Please mark up drawing of locations
-
Proposed Penetration location
Main Store - Plant Room
-
Main Incoming Supply ACB - Make, Model, Rating and Settings.
-
Is there any other generation on site?
-
What type of generation?
- CHP
- Wind
- Solar Thermal
- Diesel Generator
- Biomass
- Other
-
Please provide photo of the name plate with manufacturer/installer.
-
Is there voltage optimization equipment on site?
-
Please provide photo of the name plate with manufacturer/installer.
-
Is there spare capacity for the connection of the PV system to the Main Distribution Board?
-
Please provide photo of both ends of the Main Distribution Board to show potential location for the bolt on MCCB.
-
Please provide photo of proposed location of PV inverters and PVDB.
-
Please provide details of the Incoming meter supply: MAKE: MODEL: SERIAL NUMBER: MPAN: C/T RATIO: METER OPERATOR:
-
Specify length of AC supply Cable.
-
Specify DC route to the roof and estimated cable lengths.
-
Distance between Main Incomer and Main DB. Note cable route - i.e. ducting etc. in the case where Export Control equipment may be required.
Petrol Filling Station Roof Survey
-
What is the building height?
-
Is there permanent access to the roof?
-
Please provide photo?
-
Is it internal or external?
-
Are the parapet heights above 950mm all around the building?
-
Please mark locations of edge protection required on the project on an additional drawing.
-
Is there a fall arrest system on the roof?
-
Is it certified and in date?
-
Please confirm roof pitch.
-
Please provide Dimensional Survey of the roof complete with measurements of all plant?
-
Is there evidence of Hazardous Materials being expelled from any plant on the roof?
-
Please provide photos.
-
Is there evidence of bird soiling on the roof?
-
Please provide photos.
-
Is there lightning protection on the roof?
-
Please mark up drawing of locations
-
Proposed Penetration location
Petrol Filling Station - Plant Room
-
Main Incoming Supply ACB - Make, Model, Rating and Settings.
-
Is there any other generation on site?
-
What type of generation?
- CHP
- Wind
- Solar Thermal
- Diesel Generator
- Biomass
- Other
-
Please provide photo of the name plate with manufacturer/installer.
-
Is there voltage optimization equipment on site?
-
Please provide photo of the name plate with manufacturer/installer.
-
Is there spare capacity for the connection of the PV system to the Main Distribution Board?
-
Please provide photo of both ends of the Main Distribution Board to show potential location for the bolt on MCCB.
-
Please provide photo of proposed location of PV inverters and PVDB.
-
Please provide details of the Incoming meter supply: MAKE: MODEL: SERIAL NUMBER: MPAN: C/T RATIO: METER OPERATOR:
-
Specify length of AC supply Cable.
-
Specify DC route to the roof and estimated cable lengths.
-
Distance between Main Incomer and Main DB. Note cable route - i.e. ducting etc. in the case where Export Control equipment may be required.
Construction Phase Details
-
Please detail scaffolding and access requirements.
-
Please detail cranage and distribution requirements.
-
Please detail site set-up and welfare area. Provide annotated drawing for approval. Include Heras fencing, skip, laydown areas and office.
-
Please provide any further detail not captured already captured within this document.