Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

General

  • Please provide a photo of the front of store

  • Please provide evidence that the Safe Plan of Action has been completed

  • Please provide names of attendees

  • Is there a H&S file on site?

  • Is there an Asbestos Register on site?

  • Please provide further detail of Asbestos on site.

  • Is there a Petrol Filling Station on the site?

  • Please provide photo of Petrol Filling Station.

Main Roof Survey

  • What is the building height?

  • Is there permanent access to the roof?

  • Please provide photo?

  • Is it internal or external?

  • Are the parapet heights above 950mm all around the building?

  • Please mark locations of edge protection required on the project on an additional drawing.

  • Is there a fall arrest system on the roof?

  • Is it certified and in date?

  • Please confirm roof pitch.

  • Please provide Dimensional Survey of the roof complete with measurements of all plant?

  • Is there evidence of Hazardous Materials being expelled from any plant on the roof?

  • Please provide photos.

  • Is there evidence of bird soiling on the roof?

  • Please provide photos.

  • Is there lightning protection on the roof?

  • Please mark up drawing of locations

  • Proposed Penetration location

Main Store - Plant Room

  • Main Incoming Supply ACB - Make, Model, Rating and Settings.

  • Is there any other generation on site?

  • What type of generation?

  • Please provide photo of the name plate with manufacturer/installer.

  • Is there voltage optimization equipment on site?

  • Please provide photo of the name plate with manufacturer/installer.

  • Is there spare capacity for the connection of the PV system to the Main Distribution Board?

  • Please provide photo of both ends of the Main Distribution Board to show potential location for the bolt on MCCB.

  • Please provide photo of proposed location of PV inverters and PVDB.

  • Please provide details of the Incoming meter supply: MAKE: MODEL: SERIAL NUMBER: MPAN: C/T RATIO: METER OPERATOR:

  • Specify length of AC supply Cable.

  • Specify DC route to the roof and estimated cable lengths.

  • Distance between Main Incomer and Main DB. Note cable route - i.e. ducting etc. in the case where Export Control equipment may be required.

Petrol Filling Station Roof Survey

  • What is the building height?

  • Is there permanent access to the roof?

  • Please provide photo?

  • Is it internal or external?

  • Are the parapet heights above 950mm all around the building?

  • Please mark locations of edge protection required on the project on an additional drawing.

  • Is there a fall arrest system on the roof?

  • Is it certified and in date?

  • Please confirm roof pitch.

  • Please provide Dimensional Survey of the roof complete with measurements of all plant?

  • Is there evidence of Hazardous Materials being expelled from any plant on the roof?

  • Please provide photos.

  • Is there evidence of bird soiling on the roof?

  • Please provide photos.

  • Is there lightning protection on the roof?

  • Please mark up drawing of locations

  • Proposed Penetration location

Petrol Filling Station - Plant Room

  • Main Incoming Supply ACB - Make, Model, Rating and Settings.

  • Is there any other generation on site?

  • What type of generation?

  • Please provide photo of the name plate with manufacturer/installer.

  • Is there voltage optimization equipment on site?

  • Please provide photo of the name plate with manufacturer/installer.

  • Is there spare capacity for the connection of the PV system to the Main Distribution Board?

  • Please provide photo of both ends of the Main Distribution Board to show potential location for the bolt on MCCB.

  • Please provide photo of proposed location of PV inverters and PVDB.

  • Please provide details of the Incoming meter supply: MAKE: MODEL: SERIAL NUMBER: MPAN: C/T RATIO: METER OPERATOR:

  • Specify length of AC supply Cable.

  • Specify DC route to the roof and estimated cable lengths.

  • Distance between Main Incomer and Main DB. Note cable route - i.e. ducting etc. in the case where Export Control equipment may be required.

Construction Phase Details

  • Please detail scaffolding and access requirements.

  • Please detail cranage and distribution requirements.

  • Please detail site set-up and welfare area. Provide annotated drawing for approval. Include Heras fencing, skip, laydown areas and office.

  • Please provide any further detail not captured already captured within this document.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.