Commissioning Checklist
-
Type of system
-
System has been filled and purged of air as described in the installation manual
-
Time clock/ programmer calling heat
-
All room thermostats set to 20C or light on
-
Actuator heads open (warm to touch)
-
Manifold Thermostat head set to 50C
-
Pump running on speed 2 and pumping up
-
Return valve open
-
Bypass valve open 2 turns (Anti-clockwise)
Water Flow Rate of every circuit flow meter
-
Location
-
Rate: Lt/min
-
Location 2
-
Rate: Lt/min
-
Location 3
-
Rate: Lt/min
-
Location 4
-
Rate: Lt/min
-
Location 5
-
Rate: Lt/min
-
Location 6
-
Rate: Lt/min
-
Location 7
-
Rate: Lt/min
-
Location 8
-
Rate: Lt/min
-
Location 9
-
Rate: Lt/min
-
Location 10
-
Rate: Lt/min
Final Commissioning Checks
-
Record flow bar temperature 45C Screeded/ 65C suspended
-
Record return bar temperature between 5-10C lower than flow bar
-
Confirm all fittings are water tight and system operating satisfactory
-
Check the average floor temperatures do not exceed 29C except for bathrooms
-
Check the room temperatures are reaching the design temperature
-
Check flow to manifold
-
What is the temperature
-
Record final pump speed
-
Check & record the final pressure.
Install photos
-
Underfloor insulation
-
Underfloor insulation
-
Pipe Layout
-
Pipe Layout
-
Pipe Layout
-
Connection to manifold
-
Thermostat/ Controls working
Completed Form
-
Engineer Signature