Title Page
-
Address:
-
Customer Name:
-
Installation Date:
PV Handover Certificate
-
Installation Size:
-
Rated Power (kw DC):
-
Location of installation:
-
Estimated Performance:
-
Circuits Tested
-
IEC 60364-6 Inspection:
-
Commissioning Date:
-
I/we being the person(s) responsible for the design, construction, inspection and testing of the<br>electrical installation (as indicated by the signatures below), particulars of which are described<br>above, having exercised reasonable skill and care when carrying out the design, construction,<br>inspection and testing, hereby certify that the said work for which I/we have been responsible is, to<br>the best of my/our knowledge and belief, in accordance with MCS Installation Standard MIS 3002. I/ we agree that the job is completed and no further works are required.
-
Engineer signature.
Completion of Works Record (customer to complete)
-
Customer name:
-
When the installation was completed, all any settings, controls etc. were explained to me in a<br>jargon-free manner.
-
Are in agreement that the job is complete and have met all your requirements.
-
I/agree that we are satisfied with the works that have been completed and no other works are required.
-
If you are in agreement that the job is complete and we have met your requirements we would<br>ask that you to sign below to confirm this.<br>The signing of this form will not limit your statutory rights, nor will it affect any guarantees or<br>warranties.
-
Customer Signature