Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre-Install Checks
-
Has a risk assessment been carried out?
Battery Test
-
Test instrument
-
Battery - Make
-
Battery- Model
-
Battery - Serial Number
-
Battery - Functional Check
Commissioning Checks
-
Installation satisfies the requirements of BS7671 (IET Wiring Regulations).
-
Installation complies with cyber security requirements
DC side – Inspection & Test Requiurements
-
General check to confirm system complies with relevant standards.
-
Battery voltage suitable for location
-
Components selected and erected to suit location and external influences
-
Verification of protective measures against shock.
-
Parts selected and erected so as to minimise the risk of earth faults and short circuits.
-
Identification of any functional earthing
-
Presence of earth insulation resistance detection and alarm system
-
Presence of earth residual current monitoring detection and alarm system
-
String cables sized appropriately for prospective fault currents
-
Check of any functional earth connections
-
Check functional earth fault interrupters are fitted (where required)
-
Check of any earthing and/or equipotential bonding
-
SPDs, where fitted, suitable selected and erected
-
Measures in place to protect long cables
-
All d.c. components rated for d.c. and for voltage and current maxima
-
Plug and sockets are of same type and correctly mated
-
RCDs correctly selected and installed (where fitted) on AC side
-
All parts correctly labelled and suitably durable
-
Test to ensure the continuity of earthing and/or equipotential bonding conductors (if fitted)
-
Connection to main earthing terminal verified
Evidence Requirements
-
Existing Renewables - Manufacturer & Model and<br>Date of install
-
Fuse Board
-
Full system picture
-
Engineer sign off