Information
-
Project Reference
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Telephone Number
1. Heat Pump
-
Make
-
Model
-
Serial Number
-
Picture of ID Plate
-
Heat Pump Type
-
Ground Loops Pressure tested?
-
Ground Loops filled with Glycol and tested
-
Manifold Checked for Leaks/Serviceability?
-
Number of loops
-
Length of loops (m)
-
Freeze Protection of Glycol
2. Heating System
-
Primary Heating System
4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?
-
Number of Manifold ports
-
Pipe Centres (mm)
-
Heat Curve
-
Secondary Heating System
4.10. SWL of plant or any lifting equipment exceeded?
-
Heat Curve
3. Domestic Hot Water Storage
-
Hot Water Storage
4.5. Lack of daily inspection protocol?
-
Model
-
Serial Number
-
Cylinder Type
-
Capacity (Litres)
-
Legionella Protected
4. Settings
-
Outdoor Temperature
-
Room Temperature
-
Supply Temperature
-
Return Temperature
-
Hot Water Temperature
-
Brine In Temperature
-
Brine Out Temperature
-
Heating Stop Temperature
-
Hot Water Stop Temperature
-
Operating Time Hot Water
-
Operating Time Heating
5. Installation Details
-
System installed to Building Regulations
-
Correctly sized electrical supply and isolator fitted
-
All sensors connected and functional
-
Isolation Valves and Filter devices fitted
-
Unvented DHW safety devices fitted/serviceable
-
Flexible hoses fitted on Heating Flow and Return
-
All UFH actuators/controls working
-
Heat Pump connected to Internet
-
Cooling Enabled
-
Hot water checked at all outlets
Job Status
-
Job Complete
-
Parts required
-
Quote required
-
Return visit
-
Commissioned
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature